Nevermore Task List

From MITNA
Revision as of 09:13, 17 August 2009 by Mwall (Talk | contribs)

Jump to: navigation, search

If a task is yours and you have additional information about it, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.


Outstanding Tasks

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Critical Tasks

These are tasks that must be taken care of immediately to ensure the legal and safe operation of the boat, or to prevent immediate damage to the boat.

  • Inspect prop shaft and cutlass bearing, rudder mount, centerboard pivot pin
  • repair main sail (sbussolari)
    • re-cut main sail at leech and bottom
    • repair split seams

High Priority Tasks

These are tasks that must be done as soon as possible to ensure the safe, legal operation of the boat or to prevent damage to the vessel.

  • Fix blower and move blower hose to bottom of engine compartment.
  • get Boston Harbor Mooring Permit for 2009 (ted)
  • de-winterize the engine
    • check/change oil
    • check/change antifreeze/coolant
    • check/change transmission fluid
  • add alternator protector device (in case all batteries OFF with engine running)
  • replace boom vang mast attachment with stainless parts

Medium Priority Tasks

These are important tasks that should be taken care of as soon as possible to provide for efficient, enjoyable operation of the boat, but which do not pose an immediate safety risk or prevent operation of the boat.

  • procure/install proper anti-siphon valve on engine seawater out
  • adjust throttle friction (tspettel)
    • engine parts (shim & clamp) ordered 17Aug08
  • install strainer on seawater intake for head
  • install anti-siphon loop on seawater intake for head
  • secure holding tank
  • fix stove hoses and tank, - stove and/or tank is leaking - will only hold pressure for about 2 hours - requires extended repeated pumping to operate

Low Priority Tasks

These are tasks that would be nice to have done, but which have a lesser immediacy associated with them.

  • install new AM/FM radio (ted)
  • mount external speaker and/or mic for VHF radio in cockpit
  • install LED lighting
  • diagnose and test autonav
    • determine why it seized before reconnecting it to the rudder.
  • sand and refinish topside brightwork
  • replace manual bilge pump (handle socket is fractured)
  • resole cabin floor
  • repair wood around mast base
  • build slots for holding washboards in galley
  • design/build/install panels in starboard lazarette
    • cubbies/hangars for fenders
    • slots for cabin boards
  • replace winch handle pocket in cockpit (mwall)
  • add window to bimini so you can see the sails
  • install new traveler cam cleats inside of dodger (might not be necessary)


Cleaning Tasks (ongoing)

  • dinghy
  • deck
    • scrub the decks
    • flush soot and dirt from toe rails
  • bilge
    • the bilge needs to be scrubbed with brushes and flushed
    • clean bilge well - small particles accumulate then plug up the pump strainer
  • kitchen
    • clean/tune stove and oven
  • main cabin
    • scrub all wood surfaces with murphy's wood soap (diluted)
    • scrub ceiling of main cabin
    • scrub ceiling of main cabin berths
  • starboard lazarette
    • remove everything from lazarette then scrub it (use brushes), then put everything back when the lazarette has dried out
  • aft lazarette
    • remove everything from lazarette (including wood panels), then scrub the hull and wood panels
  • head
    • scrub all surfaces in the head
    • remove everything from cupboards and scrub them out
    • drain holding tank then flush it a few times
    • scrub the hull under the sink
    • clean drain pan and grid


Winter 2009-2010 Tasks

  • replace prop shaft and coupling -TBD
  • replace cutlass bearing -TBD
  • repair/replace cabin floor -TBD


Completed Tasks

  • 17aug09 un-bend pulpit. review of old photos shows that the pulpit was 'bent' when mit received the boat in august 2007.
  • 17aug09 re-mount and seal leaking starboard stanchion (mwall)
  • 16aug09 replace hatches (mwall, sbussolari, tyoung)
  • 16aug09 polish stanchions and pulpit (glirot, trose, hendrik, roberto)
  • 15aug09 install dodger (trose, tyoung)
  • 15aug09 re-mount and seal ladder mounts (hendrik, roberto)
  • jul09 repair dodger (fran)
  • 04jul09 procure combination cable lock for dinghy (mwall)
  • Removed Battery #3 and clean up battery wiring (ksovie)
  • 04jun09 whip ends of reefing lines (mwall)
  • 04jun09 install line on fender number 6 (mwall)
  • 04jun09 hose down topsides (kate et al)
  • 20may09 re-seal chain plates (mwall) (two on stbd side completed 10oct08)
  • 20may09 test winches (mwall)
  • 15may09 replace mast boot (mwall)
  • get Zodiac/motor ready for season (ksovie)
  • get Zodiac state registration - done -(ksovie)
  • 09may09 fix oven door (keith)
    • clean oven
    • clean oven cabinet
    • dis-assemble oven and repair bent door hinges
  • 05may09 check for leaks
    • gasket leaks in 2 of 8 windows
    • mast leaks
    • companionway hatch leaks
    • stbd chainplate leaks (foremost of 3)
    • stanchions leak
    • ladder mounts leak
    • small hatch leaks
  • 03may09 finish freshwater system
    • pump, filter, and accumulator re-attached
    • filled freshwater tanks to pressurize and check for leaks
    • fix leaks at faucets (no leaks as of 03may09)
    • fix leaks at hot water tank (ksovie)
  • 03may09 all upper portholes replaced.
  • apr09 install capture wires on anchor retention pin(s)
  • Dinghy procured
  • spec and order new speedometer (Ted)
    • replacement ordered from ebay for $0.99. Seems to work.
  • nov08 add a home for a winch handle near the mast (mwall)
  • determine where Nevermore will be docked/moored in 2009 done - Boston Waterfront Marina
  • Apr 09 * clean and lube winches
    • NOTE: there is one instruction manual in ship's reference booklets (accordion folder)(Kenn)
  • aug08 * Repair/upgrade traveller (mwall, ksovie)
  • 09nov08 install cam cleats on traveler as short-term solution (mwall)
  • 09nov08 replace pumpout hose section (mwall)
  • 18oct08 fix freshwater leaks at T fittings below galley sink (mwall)
  • 18oct08 procure more hose clamps and install in head (mwall)
  • 13oct08 burn ends of burgee halyard (mwall)
  • 13oct08 attach wing nuts to top of engine to secure metal box (mwall)
  • 10oct08 whip bitter end of spinnaker halyard (mwall)
  • 10oct08 whip ends of traveler sheets, main sheet (mwall)
  •  ??Oct?08 replace missing screw on base of furler (tspettel)
  •  ?? inventory what is on boat (samajane)
  •  ?? procure new emergency and first-aid kit (asilveira)
  • 03oct08 repair the head (tyoung, mwall)
    • replace all head hoses
    • replace holding tank diagram (See Ronco B500 Tank)
    • install pump for manual pumpouts at sea
  • 22sep08 repair freshwater system (mwall)
    • freshwater system diagram
    • attach new hot water heater (DONE)
    • remove remaining old hoses (DONE)
    • install pressure relief valve on hot water heater (DONE)
    • connect hot water heater to 110v system (DONE)
    • replace hoses from engine to hot water heater (8' of 5/8" ID hose, cut into two hoses)
    • attach starboard fill hose to starboard tank (DONE)
    • clean tanks and hoses with bleach then flush
    • pressure test the freshwater system, checking for leaks at every connection (DONE)
    • accumulator needs to be mounted (DONE)
    • replace accumulator (DONE)
  • 20sep08 replace boom pin with a pin that has a head (gigi, mwall)
  • 20sep08 install cup holders (gigi)
  • 18sep08 Install wiring for compass light. (Ted)
  • 30aug08 procure a new dinghy (boat, boards, motor) (ksovie)
  • scan Fall '07 survey report (to put on wiki?) or just put aboard Nevermore? (NOT NEEDED)
    • fcharles says Aug08 that report has no technical info, just worth estimate for insurance
  • 28aug08 Adjust stuffing box after running the engine awhile, assess drippage and tighten accordingly. Stuffing box is barely dripping, but it is wet. so apparently we are getting lubrication. need to continue to monitor it to assure that locking nut is secure (do not want the assembly to walk off the end of the threads). (mwall)
  • 15aug08 attach VHF antenna (mwall)
  • 31jul08 tighten lifelines (DONE)
  • 29jul08 fix blower and move its hose to bilge (DONE)
  • jul08 wiring needs to be tidied up, specifically raised to be further from water levels
  • jun08 inspect top-of-mast furler, stays, swages, etc (ted, mwall)
    • as of 10may08, there is rusty patina on some stays, but no cracks or broken strands
  • jul08 assess rudder situation
    • unsieze the rudder (DONE mwall)
    • assess/repair fibreglass cracks
    • anti-fouling paint to rudder inner surfaces (DONE)
  • jul08 prop and drive shaft
    • finish polishing (DONE)
    • apply anti-fouling paint (DONE)
    • install zincs (DONE)
  • jul08 spinnaker halyard
    • attach shackle with eye splice (DONE)
  • may/jun 08 engine tune-up
    • replace engine raw water inlet elbow with straight barb (DONE)
    • replace raw-water hose from separator to pump inlet (DONE)
    • run engine and check lube oil level and freshwater cooling level, and leaks (DONE)
      • fuel seeps minimized, need more parts to be better (DONE (to a point))
        • order parts (after July 4th holidays)
      • one oil seep (dip-stick tube -to- pan) can't be fixed? (per previous owner log)
      • hookup oil cooler raw water feed (removed when looking for water in oil) (DONE)
      • install air-release valve in raw water anti-siphon loop (ThomS)
        • install temporary valve (household "coin valve") (DONE)
        • mount anti-siphon loop reliably above waterline (ThomS)
        • (later procure/install proper anti-siphon valve (if we want one) (ThomS)
    • Change transmission fluid (after launch) (ThomS)
  • jul08 Replace rusty nuts & bolts on stem plate
    • remove old nuts/bolts (DONE ted, asilveira)
    • procure new nuts and bolts (5x 3/8-16 flat-head stainless bolts, 4x 2" long, & 1x 2-1/2" long) (DONE)
    • prep surfaces, seal and reinstall (DONE)
  • may/jun 08 repaint name and hailing port on stern (ksovie & his son)
    • remove old name & hailing port using wet 500+ sandpaper, possibly acetone to help (DONE)
    • procure/cut new vinyl lettering (DONE)
    • install new lettering (DONE)
    • compound/wax transom - (ksovie)
  • jul08 Re-rig centerboard pennant thru mast (during mast step)
  • jul08 connect electric wires from mast
    • top-of-mast lights (4 wires), masthead/deck lights (3 wires), VHF (coax), RADAR (multi-wire cable), wind indicator (multi-wire cable)
  • 30jul08 install mounting bracket for bilge pump air bell (DONE)
  • 17may08 removed water heater (12 gallon raritan electric/exchanger)
  • 17may08 scraped paint from prop strut
  • 17may08 removed old, pitted zincs from prop shaft
  • make arrangements for mooring through nov 2008 (mwall)
    • 17may08 confirmed a mooring with boston harbor sailing club for the 2008 season
  • Remove winter cover (spring '08) (MWall, KennS, ThomS)
    • pack it up neatly, and take it to Albany St. basement (building N4)
    • key is at pavilion, on nail-in-wall just inside upstairs office/protest room
  • fix bimini support to avoid traveler (ksovie)
  • get boat surveyed (fcharles) - DONE - surveyed 04Dec
  • get boat to boston :) (mlindblad, fcharles, asilveira, rcleary, smgarrel, mwall)
  • remove unused stuff from boat (asilveira, rcleary, mwall)
  • clean kitchen equipment (asilveira)
  • procure freshwater pumps (rcleary)
  • install freshwater pump (tyoung)
  • lubricate door fittings (mwall)
  • clean curtains (asilveira)
  • 12v batteries and switches documented (tspettel)
  • repair bilge pump and move to stern lazarette (tyoung)
  • diagnose engine instruments (tspettel & tyoung)
  • scrub inside of port cabin bench DONE (samajane/lfortmiller)
  • scrub inside of port nav station compartment (beneath and to the left of the nav table) (samajane)
  • scrub inner hull surfaces and vertical surfaces in the clothing cabinets (located near the head) (samajane/lfortmiller)
  • repair faulty tachometer (tyoung)
  • repair torn bimini (tyoung)
  • scrub inside of freshwater tanks (samajane/tyoung/asilveira/rcleary)
  • install new freshwater manual pump (twanderer)
  • remove stove hoses and replace with new hoses (tyoung)
  • purge stove fuel tank, clean, and reinstall (tyoung)
  • install new shroud protection (mwall)
  • procure life jackets (asilveira)
  • sand down to fit, & revarnish, 3 saloon sole hatches (tspettel)
  • scrub topsides to remove scuffs, epoxy, and mildew (and peanuts) (mwall)
  • put line on steering wheel for grip and centering (mwall)
    • blue one installed short-term. might install something more extensive later.
  • scotchbrite topside stainless fittings (pulpit, stanchions, anchor tray) to remove rust (mwall)
  • replace fresh air intake cowl (dorade) on deck (ksovie)
  • procure & change engine fluids: (doing as part of Winterizing '07/08) (DONE ThomS)
    • fresh water coolant antifreeze - DONE - Nov07
    • engine oil and filter - DONE - Nov07
  • Update Garmin GPS software (DONE ted)
  • new depth sounder thruhull (DONE ted)
  • head input thruhull has de-laminated, neet to re-epoxy (DONE mwall)
  • prep and re-paint/touch-up hull (ablative paint) (DONE ted, mwall)
  • fix bilge pump (believe FIXED ted)
  • secure nav light wiring in anchor compartment (DONE ted)
  • install new bilge pump float switch (DONE ted)
  • Mark hull with registration number (DONE ted)
  • depth sounder wires need to be run to the instrument. (DONE ted)
  • get binnacle compass bubble out
    • remove compass and take to Fran at pavilion (DONE Ted)
    • take to get it repaired (DONE fcharles)
    • reinstall (DONE Ted)
  • Woodworking (dca)
    • Fit & install aft lazarette shelf support
    • Shelf under nav berth
    • Build shelves for storage under v-berth
    • Install hooks for lines under starboard v-berth
  • replace broken porthole assembly (DONE brehrig)
  • replace head thru-hull fittings (DONE tyoung, mwall)
    • new flange/fairing on input thruhull (DONE)
    • remove old thruhull and install new one (DONE)
    • install new valve and hose barb to the new thruhull (DONE)
  • renew coast guard documentation (DONE ted, fcharles)
    • put the Certificate of Documentation aboard (DONE ted)
  • replace two engine pencil-zincs Fall/Winter '07/'08 (DONE)
  • clean/replace fuel filters (DONE)
  • fix head (DONE ted)