X-Dimension task list

From MITNA
Revision as of 17:11, 9 March 2013 by Bussolari (Talk | contribs)

Jump to: navigation, search

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Early Spring 2013 Tasks

Engine oil leaks

Electrical system

Navigation/Data collection

Sails and rigging

High Priority Tasks

Low Priority Tasks

Unprioritized Tasks

  • evaluate and fix keel seep next to head
  • evaluate (and replace?) foam in keel
  • fair keel
  • rebuild rudder
  • clean fuel system
  • replace forward gasket on engine to stop oil leaks
  • replace aft gasket on engine to stop oil leaks
  • evaluate and fix engine oil leaks - swap out lube oil filter mount for spin-on mount
  • move fuel oil filter from inside stbd locker to inside steps
  • reverse engine kill cable mechanism
  • evaluate electrical bonding status
  • replace defective forward bilge float switch
  • adjust bilge float switch levels (lower by 2 inches)
  • repair freshwater tank leak
  • replace cabin windows
  • fabricate gasket for galley porthole
  • replace hatch lenses - head and main cabin (See [1])
  • refurbish large manual bilge pump
  • install hoses for large manual bilge pump
  • fix holding tank leaks (there are at least two)
  • re-bed mast base ring
  • have winch barrels resurfaced (boom winch certainly; aft main winches, others??)
  • install cleat on deck next to stbd mast winch (stbd jib halyard)
  • install four hooks in forepeak for additional anchor rodes
  • secure backstay chainplate base
  • repair gps antenna thru-rail fitting (port aft transom toerail)
  • re-weld starboard stanchion of pulpit
  • re-bed pulpit, back with g10
  • re-bed pushpit, back with g10
  • polish stainless steel pulpit and pushpit
  • fabricate new stanchion bases
  • replace stainless stanchion with aluminum stanchion
  • fabricate and install new gaskets on lazarettes - new gasket material is on boat 17may12
  • fabricate hinckley-style lazarette closures
  • re-install port and starboard compasses
  • design and implement drain for well beneath mast
  • cut 1/2" drain hole in mast base plate
  • replace dodger track end caps
  • install second spinnaker halyard and block
  • rebuild winches
  • fix long batten from main sail
  • repair dodger zipper
  • repair 150 jib
  • repair main sail cars
  • fix dinghy floor leak
  • fix dinghy fuel leak
  • replace dinghy painter (with floating line?)
  • replace baby stay cable
  • refurbish baby stay fast pins and shackles
  • repair sail cover
  • repair dodger zipper
  • repair dodger snaps
  • plug leaks
    • tighten rudder stuffing box
    • seal cockpit holes - 10 on forward bulkhead, 2 or 3 on starboard bulkhead
    • seal autopilot frame
    • re-install and seal tactical compass (in v-berth port cupboard)
    • freshwater tank at forward end, significant seep into bilge
    • saltwater seep 1.5' foreward of mast over keel
    • re-bed binnacle to stop leaks at rudder cable port and starboard
  • electrical system overhaul - tyoung
    • reconnect stereo
    • connect aux nav lights
    • connect propane solenoid
    • replace missing bulbs and cabin light fixtures
    • install new ceiling lights
    • install 12v sockets
    • replace bad house battery
    • tidy up wiring behind breakers
    • install propane solenoid indicator at helm
    • install freshwater pump indicator at helm
  • replace light fixtures with led fixtures - tyoung
  • install lights in port and starboard lazarettes
  • replace nav station light with led
  • move engine systems switch from inside stbd locker to more convenient location
  • repair scratches in red paint - port aft, port midships, port toerail, port bow, stbd midships
  • strip brightwork and apply cetol
  • paint cabin interior ceiling
  • paint hatch locking bars with epoxy paint
  • repair floor edge support in main cabin starboard of nav table
  • repair floor edge support port of nav station seat
  • install pen holder at nav station
  • clean and bleach bilge to remove oil slicks, stains, and smells
  • clean and bleach head to remove urin smell
  • clean and bleach vberth to remove sewage smells

Completed Tasks

  • 12nov12 winterize boat (engine, halyards, sails, freshwater, septic) - sbussolari, ksovie, mwall
  • 12nov12 repair wood trim on vberth sink access panel - mwall
  • 27oct12 install forward hatch retainer for keeping hatch open - mwall
  • 06jul12 boom vang tube - delivered
  • 29jun12 boom vang spring - ordered
  • 19sep12 worked on port forward winch which was turning both ways. Winch is functional, but needs to be rebuilt - sdynes
  • 12sep12 added chafe protection to oil cooler hose (was rubbing on engine mount) - sdynes, dweisman
  • 12sep12 replaced steaming nav light and lens - tyoung, sdynes, lbush, dweisman
  • 12sep12 replaced spinnaker halyard - sdynes, lbush, dweisman, tyoung
  • 12sep12 changed hailing port on transom to Cambridge, MA - tyoung, rdisbrow, lbush, dweisman
  • 12sep12 fender step installed tyoung
  • 10aug12 changed transmission oil - sdynes
  • 10aug12 lubricated main outhaul track and car with a light coating of winch grease - sdynes
  • 10aug12 unscrewed cap ove rudder post, used anti-sieze compound when replacing - sdynes
  • 13jul12 re-bed forward hatch plexiglass and hinges - mwall, jwarner, jspitzberg
  • 13jul12 re-install mast boot - mwall
  • 13jul12 re-bed chain plates - mwall, jwarner, jspitzberg
  • 13jul12 install pvc storage tubes in starboard lazarette - jwarner, jspitzberg
  • 12jul12 6 pfds to boat - tyoung
  • 12jul12 2 life jackets into dock box (from pavilion?) - tyoung
  • 12jul12 re-mount companionway board storage rack in starboard lazarette - mwall
  • 11jul12 repair and refinish wooden boarding ladder - tyoung
  • 11jul12 wrenches into wraps - jwarner
  • 11jul12 install wastebin on galley cabinet door - jwarner
  • 11jul12 rebuild companionway board storage box - tyoung
  • 11jul12 refurbish steering wheel brake - tyoung
  • 11jul12 re-bed traveler rail - port end is loose - sbussolari
  • 11jul12 coaming - gaps between wood and fiberglass - mwall
  • 10jul12 connect GPS NMEA0183 output to VHF radio - tyoung
  • 07jul12 connect footlights - tyoung
  • 07jul12 replace corroded nav light sockets at bow - tyoung
  • 07jul12 connect blower - tyoung
  • 07jul12 connect fridge - tyoung
  • 06jul12 connect wind/depth/GPS instruments via NMEA2000 network - tyoung
  • 04jul12 connected stern light - tyoung
  • 03jul12 connect sidelights - tyoung
  • 03jul12 replace traveler hardware - sbussolari
  • 03jul12 install new traveler car - sbussolari
  • 03jul12 install new end controls - sbussolari
  • 03jul12 re-bed head dorade tube and dorade - mwall
  • 03jul12 seal cockpit holes - 2 compasses - mwall
  • 03jul12 install new blower hood at stbd aft toerail - mwall
  • 03jul12 remount and seal garmin instruments
  • 02jul12 fix oil filter leak - big leak at top of blue filter housing on aft end of engine - sdynes
  • 02ul12 fabricate oil catch pan - temporary solution from three foil trays - sdynes
  • 01jul12 install dinghy registration sticker - tyoung
  • 01jul12 stow remaining bluewater gear at pavilion - mwall, tyoung
  • 01jul12 tune life lines, recondition turnbuckles and shackles - ebrown
  • 01jul12 re-seat pulpit - ebrown
  • 01jul12 bring remaining gear to boat - sbussolari, tyoung
  • 01jul12 rebed main sheet (2) and main halyard (1) cheek blocks - sbussolari, brehrig
  • 01jul12 reinstall dinghy u-bolt, dock lines, and lock - mwall
  • 01jul12 fix dinghy painter - mwall
  • 01jul12 unplug propane enclosure drain - brehrig
  • 01jul12 clean propane enclosure - brehrig
  • 01jul12 clean ice box - mwall
  • 01jul12 clean head ceiling - ebrown
  • 01jul12 plug two holes in aft toerail - mwall
  • 01jul12 fabricate oil catch pan - temporary solution from two foil trays - mwall
  • 30jun12 installed lock on dock box - mwall
  • 30jun12 re-tie dinghy bow/stern lines - ebrown
  • 30jun12 properly configure dinghy straps - ebrown
  • 30jun12 sort out dinghy equipment (extra pumps/hoses, etc), put single spare in dock box - ebrown
  • 30jun12 install fast pins on locking bars - mwall
  • -skip-- replace alternator belt (40" 25-9425) - does not need replacement, as smaller will not work - sdynes
  • 30jun12 replace broken boom vang tackle (6:1) and line - mwall
  • 30jun12 5 halyard blocks at base of mast for 1/2" line - sbussolari
  • 30jun12 2 main sheet blocks for 1/2" line - mwall
  • 30jun12 install exhaust riser insulation - mwall, tyoung
  • 30jun12 install jib - sbussolari
  • 30jun12 clean and grease rudder rack and pinion - ebrown
  • 30jun12 mount gps and instruments - tyoung
  • 30jun12 mount new blower - mwall
  • 29jun12 glass over former cooler access on port lazarette - sbussolari, tyoung
  • 29jun12 glass over hole above garmin chartplotter - tyoung
  • 29jun12 strip and bleach ceiling above starboard berths - ebrown, sbussolari
  • 29jun12 strip and bleach ceiling above port berths - ebrown
  • 29jun12 strip and bleach ceiling above nav berth - ebrown
  • 29jun12 procure bag for dinghy pump/hose - purple bag at pavilion, can hang from dingy seat
  • 28jun12 manual bilge pump tested and repaired - uferner, scott
  • 28jun12 aft pair of 32in winches rebuilt - uferner, scott
  • 28jun12 clean cabinets between main cabin and v-berth
  • 28jun12 clean v-berth hull - mwall
  • 28jun12 drill hole in nav station floorboard - mwall
  • 24jun12 replace forward hatch gasket - sdynes
  • 24jun12 adjust seal on prop shaft to reduce shaft heat buildup - sdynes, tyoung
  • 24jun12 install navigation lights sub-panel - tyoung
  • 24jun12 re-install radio, radar, & engine instrument panel
  • 24jun12 install horn button
  • 23jun12 Re-install engine instruments panel - tyoung
  • 23jun12 replace engine indicator panel plexiglass - tyoung
  • 22jun12 replace raw water strainer mesh - sdynes
  • 22jun12 replace raw water strainer gasket - sdynes
  • 18jun12 secure freshwater faucet in v-berth - mwall
  • 18jun12 refurbish dinghy - ksovie, ebrown
  • 18jun12 rebed freshwater in thru-deck - sbussolari, sdynes
  • 18jun12 install mast boot (temporary) - mwall
  • 18jun12 repair main cabin floor support port side of mast base - simon
  • 18jun12 install hooks in v-berth cabinets - uferner
  • 18jun12 diagnose and repair fuel supply problem - sdynes
  • 16jun12 christen the head - sbussolari, mwall
  • 16jun12 leak-test septic system - sbussolari
  • 16jun12 clean and deploy guppy - mwall
  • 16jun12 clean and install dorade vents - uferner
  • 16jun12 plug leaks in mast ring - sbussolari, mwall
  • 16jun12 plug holes in nav table - sbussolari
  • 16jun12 inflate fenders - uferner
  • 16jun12 seal deck holes - 30-some screw holes for interior grab rails - sbussolari
  • 16jun12 seal deck holes - 6 from old jam cleats - sbussolari
  • 16jun12 seal deck holes - 6 from old aluminum track along starboard side of companionway - sbussolari
  • 16jun12 seal deck holes - re-bed old baby-stay hard point - sbussolari
  • 16jun12 seal cockpit holes - 2 in port lazarette drain gulley - sbussolari
  • 15jun12 re-thread and refurbish soap dispenser at galley - mwall
  • 14jun12 repair engine compartment panels and hinges - danderson
  • 12jun12 secure nav station stool - mwall
  • 12jun12 install new exhaust riser - mwall
  • 12jun12 reconnect coolant hoses - mwall
  • 12jun12 flush and replace coolant - tyoung, mwall
  • 11jun12 replace two port-side oil hoses - tyoung
  • 11jun12 replace engine exhaust - sdynes
  • 11jun12 replace seawater impeller - sdynes
  • 11jun12 replace/clean primary fuel filter - sdynes
  • 11jun12 replace/clean fuel/water separator - sdynes
  • 10jun12 change oil - sdynes, tyoung
  • 10jun12 re-plumb engine shutoff - tyoung
  •  ??jun12 strip peeling paint in cabin interior - tyoung, ksovie, others
  •  ??jun12 bleach interior surfaces to kill mildew - tyoung, ksovie, others
  • 02jun12 reinstalled v-berth sink hatch with finger catch - dca
  • 02jun12 repaired galley floor stringer - dca
  • 26may12 reinstalled companionway steps - dca
  • 21may12 second coat of bottom paint to stbd keel surface - mwall
  • 21may12 re-bed chain plates - mwall (6 hours)
  • 21may12 fabricate steel backing plates for part of large chain plates
  • 20may12 buff topsides - mwall (3 hours)
  • 20may12 install mast hardware - tyoung
  • 20may12 repair more wiring - tyoung
  • 20may12 apply fastprop to propellor and shaft - ebrown
  • 20may12 fabricate g10 backing plates for chain plates - mwall
  • 20may12 seal rotted core at chain plates - mwall
  • 20may12 paint starboard keel surface first coat - mwall
  • 20may12 paint head thru-hull first coat - mwall
  • 19may12 check and rewire 12V system - tyoung
  • 19may12 second coat of paint on mast spots - eric
  • 19may12 remove blower vent, worn jam cleat - larry
  • 19may12 second coat of bottom paint touchup - uferner
  • 19may12 apply more filler on keel - uferner
  • 19may12 install head thru-hull - simon
  • 19may12 remove corroded backing plates for chain plates - mwall
  • 19may12 replace exhaust thru-hull - mwall
  • 19may12 paint transducer - mwall
  • 18may12 remove compasses for refurbishment - tyoung
  • 18may12 install new floorboard - sbussolari
  • 18may12 plumb refurbished toilet - sbussolari
  • 18may12 install new breakers, wiring - tyoung
  • 18may12 grind epoxy from chainplates - mwall
  • 18may12 install new starter motor - tyoung, mwall
  • 18may12 bottom paint touchup - mwall
  • 17may12 clean waterline - dhealey, uferner
  • 17may12 polish prop - retro
  • 13may12 repair broken floor support in galley - danderson
  • 17may12 install terminator for mast wind instruments - tyoung
  • 17may12 install horn on mast - tyoung
  • 17may12 paint mast - mar, mangle, tyoung
  • 11may12 repair mast corrosion - mwall, kwinstein, tyoung, sbussolari
  •  ??may12 install bilge switches (2, illuminated when pump on) - tyoung
  •  ??may12 tidy up electrical wiring in nav area - tyoung
  • 17may12 sand/grind cracks in bottom - sdynes
  • 17may12 apply filler to bottom cracks - sdynes, tyoung, retro
  • 17may12 paint the bottom - dhealey, uferner, sdynes, mar, retro
  • 17may12 install new engine mount - mangle
  • 14may12 clear obstructions from drainage tubes under primary winches - tyoung
  • 14may12 remove unused wedges from worn jam cleats - mwall
  • 14may12 remove starter motor - tyoung, mwall
  • 14may12 sand hull to prep for paint - retro, dweisman
  • 14may12 clean waterline - uferner, dweisman
  • 14may12 sand/grind/feather keel - sdynes
  • 14may12 sand epoxy on mast - ebrown
  • 14may12 plug 4 holes in rudder - retro
  • 14may12 replace zincs on propellor shaft - dweisman
  • 14may12 remove 5200 scraps from thru-hulls - tyoung, mwall
  •  ??mar12 replace septic system hoses - sbussolari
  •  ??may12 install holding tank - sbussolari
  •  ??may12 rebuild toilet - sbussolari
  •  ??may12 fabricate head floorboard - sbussolari, thall
  • 10may12 figure out better path for traveler lines and cleats - decision made to use 4:1 traveler with cam cleats on ends
  •  ??mar12 replace fractured compass glass on pedestal
  •  ??apr12 fix nav station clock - tyoung
  •  ??may12 install saltwater washdown pump in galley - simon
  •  ??may12 freshwater: install new hoses - simon
  •  ??may12 freshwater: install new faucets in head/cabin - simon
  •  ??may12 freshwater: install saltwater pre-wash to galley sink - simon
  •  ??may12 freshwater: install new drain hoses - simon
  •  ??may12 freshwater: refurbish and install pump, accumulator, filter - simon
  • 10may12 re-core part of foredeck - wfoster
  •  ??apr12 diagnose and repair cracks on deck around jib halyard block
  •  ??apr12 inspect chainplates and mast rigging
  •  ??apr12 re-plumb and rebuild/replace manual bilge pumps (one manual pump installed)
  •  ??apr12 rewire and re-plumb primary (diaphram) bilge pump
  •  ??apr12 install secondary (submersible) bilge pump
  • 26apr12 drill hole for saltwater hand pump
  •  ??mar12 install new thru-hull valves
  • 18feb12 remove toilet floorboard for repair - sbussolari
  • 18feb12 remove batteries from boat - ebrown, tyoung
  • 18feb12 clean bilge well - ebrown
  • 18feb12 clean bildge - ebrown, mwall
  • 18feb12 clean engine - mwall
  • 18feb12 remove hot water heater - tyoung
  • 18feb12 remove propane fittings - tyoung
  • 18feb12 clean cockpit hull interior - kwinstein, tyoung
  • 18feb12 refine septic system layout - sbussolari
  • 18feb12 refine bilge system layout - kwinstein
  • 18feb12 tighten tent - ebrown
  • 15feb12 clean bilge - mwall, ebrown, swatts
  • 15feb12 remove old bilge hoses - kwinstein
  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted