Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(MIT Work)
(Off-Season Work)
Line 30: Line 30:
 
* More permanent repair to companionway screen (+ better place to store)  
 
* More permanent repair to companionway screen (+ better place to store)  
 
* Clean up wood around bilge panels for easier access
 
* Clean up wood around bilge panels for easier access
 +
* Get all around white light for dinghy at night?
  
 
= Dion's Work =
 
= Dion's Work =

Revision as of 14:36, 31 July 2023

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

MIT Work

  • Calibrate all instruments following factory procedures
  • Remove speed sensor and clean
  • Get Raymarine wireless displays talking to H5000 again
  • Get AIS displaying on Zues3S
  • Put radar connector in more waterproof and secure location in lazarette locker
  • Repair 140 leech
  • SOP + pictures of jackline setup
  • Bungees on head hatch - Gavin
  • Replace latch on dinghy bow hatch (new latch onboard Mashnee)
  • Hand stitch the 95 Jib luff again?
  • Scrub bilges around engine with Dawn or Joy to remove fuel leak residue
  • Grease companionway tracks
  • Improving reefing setup at tack

Off-Season Work

  • Mounting for compass? New compass?
  • Working jib - bolt rope on the luff frayed near the head - fix
  • Stitch zipper stops for all sail bags
  • Cunningham purchase system to easily be soft shackled on when needed - carabiner?
  • Longer jib furling line to let us lead it aft? Soft shackle fairlead?
  • Ring-dings for turnbuckles
  • Replace eye for lee cloth on port berth
  • Repair screen on the starboard porthole
  • More permanent repair to companionway screen (+ better place to store)
  • Clean up wood around bilge panels for easier access
  • Get all around white light for dinghy at night?

Dion's Work

  • Get 1" half oval from Hamilton for Centerboard Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
  • Replace topping lift dyneema line
  • We need a new (3rd) cowl vent, one went missing at the start of the season.
  • to confirm: The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls
  • Polish fuel tank- Boat should arrive with less than 1/3 tank
  • Replace or repair two bent stanchions

North Work

  • We need a new canvas boot for the mast-deck connection.
  • Two little covers for furler line port.


Budget for Next Year

  • New jib sheets (60', 9/16 polyester double braid)
  • New main sheet (three-strand works well - 90', 9/16" three-strand)
  • Replace last two inflatable PFDs (2024 will be their 10th season)
  • Fill holes on lazarette and bow hatch strut attachment and re-install