Nevermore Depart Checklist
From MITNA
This is the checklist of thing to do before getting underway.
- Unlock cabin, starboard lazarette, and stern lazarette. Stow locks in top drawer of nav station.
- Remove companionway boards. Stow in cabin.
- Make log entry. Include at least the following:
- date and time
- name of each person on board
- if more than 6 passengers, indicate
- which are passengers (up to 6), and
- which are competent crew per USCG-UPV requirements (any number)
- if more than 6 passengers, indicate
- engine hours at start
- Remove guppy. Stow in bucket in stern lazarette.
- Remove binnacle compass cover. Stow where winch handles are stowed.
- Set lower battery switch to "1"
- Set main breaker to 'on'
- Open yellow seacock under sink in head.[discuss ]
- Check engine oil and coolant levels.
- Check battery fluid levels.[discuss ]
- Check holding tank level.
- Check recent log entries.
- Give basic safety lecture for passengers
- Give competent crew safety & operations instruction if not sure have been trained