Difference between revisions of "Talk:Mashnee task list"
From MITNA
(→Inboard observations:) |
(→Mast inspection) |
||
| Line 21: | Line 21: | ||
*Unclear if engine has been winterized or routine maintenance carried out yet (Nov. 8, 2025) | *Unclear if engine has been winterized or routine maintenance carried out yet (Nov. 8, 2025) | ||
| − | == Mast | + | == Mast and Rig == |
| + | *Stainless steel U-shaped shackle connecting forestay to bowsprit has surface rust at top, beneath roller curler | ||
== Sail Inspection == | == Sail Inspection == | ||
Revision as of 19:15, 8 November 2025
Contents
End of 2025 season
Out-of-water observations:
- Bottom paint: needs solid scraping and renewal. General cracking along plank lines. Bare patches, including one bare long enough to grow a barnacle
- Topsides paint: some dings aft, but generally in good condition. Light cracking along plank lines
- Toerails: wear consistent with use in places
- Bowsprit: varnish cracked through to the wood at end, where the Code Zero furler would hit it. Some discoloration around cracks
- Cabin top and hatches: varnish in good shape, need surface renewal only
- Forward hatch: strut is detached from hatch: bedding block for the screws needs to be repaired or replaced
- Propeller/shaft/zincs: zincs showing surface wear only. Marine growth on propeller and shaft
- Rudder: marine growth between rudder post and hull
Inboard observations:
- Chainplates: deep green for the most part, worst near stainless steel diagonal stringers; do not show significant change from spring 2025 or fall 2024
- Mast Step: ok
- Mild mildew growth throughout interior (washed down with mild bleach and water rinse, left compartments open to air)
- Unclear if engine has been winterized or routine maintenance carried out yet (Nov. 8, 2025)
Mast and Rig
- Stainless steel U-shaped shackle connecting forestay to bowsprit has surface rust at top, beneath roller curler
Sail Inspection
Mainsail:
160:
140:
95
Working jib (old)
Big Red Spinnaker
Code Zero
- Not unrolled for inspection.
Running Rigging
(Numerical key: 1 = good condition, close to new; 2 = light wear, no problems; 3 = moderate wear, nothing concerning; 4 = moderate wear, monitor, plan replacement; 5 = replace this season)
Running backstays, standing part (new 2024)
Running backstays, running part
Topping lift
Main halyard:
Main sheet (new 2024)
- 3. Surface wear, light. Yarns look strong across rope. Uneven pull on strands ~1/3 of distance from standing end. End for end this year.
Main outhaul
Deep reef outhaul
Shallow reef outhaul
Jib halyard
Jib sheets (new 2024)
- 3. Moderate-heavy wear across coating on both sheets. Both have broken stands ~4 inches from one of the end.
Spinnaker halyard (red fleck)
Spinnaker halyard (beige with dyneema section)
Spinnaker tack outhaul (black)
- 2. Areas of concentrated moderate wear on outer coating. End for end if possible
Spinnaker tack outhaul (blue)
Spinnaker sheets
- 4. Stripped dynema sections show heavy wear, consistent breakage in outer fibers giving them a fuzzy appearance, and some pulled strands. Moderate wear on coated sections.