Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(Admin:)
(Rigging:)
Line 18: Line 18:
 
===Rigging:===
 
===Rigging:===
 
*End for end mainsheet (Libby)
 
*End for end mainsheet (Libby)
 +
*Replace main halyard; decide on replacement timeline for topping lift, red fleck spin halyard, and spin sheets
 +
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  
 
===Engine:===
 
===Engine:===

Revision as of 21:03, 11 November 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

Sails and canvas:

Rigging:

  • End for end mainsheet (Libby)
  • Replace main halyard; decide on replacement timeline for topping lift, red fleck spin halyard, and spin sheets
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow

Gear:

  • New inflator for DanBuoy (requested for fall 2025--follow up)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here