==2024-25 Offseason work ==  
+
==2025-26 Offseason Work ==  
  
 
Observations are listed on Discussion page
 
Observations are listed on Discussion page
  
 
===Hull and woodwork:===
 
===Hull and woodwork:===
*Plane edges of floor boards so they don’t stick (safety - Dions)
+
*Renew Bottom Paint (Dions)
*Hatch top compass mount (Gavin)
+
*Renew topsides paint (Dions)
*Porthole screen covers (Ted)
+
*Maintain varnish on deck structures (Dions)
 +
*Repair cracked/broken varnish on bowsprit (Dions)
 +
*Inspect dark spots under fittings at top of mast for rot (Dions)
 +
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
 +
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
 +
*Plane edges of soleboards/floorboards so they don't stick (Dions)
 +
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
  
 
===Sails and canvas:===
 
===Sails and canvas:===
**Recutting 140 to 120
+
*Repair 95 and 160 at North
*Repair cabin top cover (North/Wally)
+
*Patch working jib (MIT)
*New mast boot cover (Libby?)
+
*Renew spreader patches on 160 (MIT)
*Minor sail repairs per observations on discussion page (MIT)
+
*Verify status of 140 and green spinnaker - are these still at North?
*Price out sail improvements (Adam)
+
*Replace foot battens in 160 (North)
**UV strip for 95
+
*Price out top-down furler for spinnaker
**Cruising 95 with no battens, UV strip
+
*New mast boot (Libby)
  
 
===Rigging:===
 
===Rigging:===
*Seal loose fibers at heel of mast against rot (safety – Dions)
+
*End for end mainsheet (Libby)
*Check condition of bronze on chain plates below deck (safety - Dions)
+
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
*Fix springs in jib car pins
+
**Probably: replace topping lift and/or main halyard (MIT - Dan)
*Top cap for furler foil
+
*Repair/replace jib car pins
*Gear for spinnaker peels (Adam)
+
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
*Messenger lines for halyards (wish list)
+
*Thump mat or puddening for Code Zero furler (MIT)
 +
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
 +
*Re-seat pin holding lower end of bobstay (Dions)
 +
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
 +
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
  
 
===Engine:===
 
===Engine:===
 +
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 
*Change raw water impeller (Dions)
 
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
  
 
===Systems:===
 
===Systems:===
*Wireless instrument broadcast (Adam)
+
 
*Find wireless instruments
+
*Fix leak in bilge pump outflow (should be within MIT capabilities)
*Backup nav lights (Adam)
+
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
*Check wind index for bird damage (Dions?)
+
*Replace joker valve proactively (MIT)
*Put batteries on trickle charger?
+
*Download B&G data (Adam)
+
*Price doppler boat speed alternative (Ryan)
+
  
 
===Gear:===
 
===Gear:===
*New inflator for DanBuoy (requested for fall 2025--follow up)
+
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
  
 
===Admin:===
 
===Admin:===
 
+
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
  
 
===Shopping List===
 
===Shopping List===
*Green bulbs for running lights: Makergroup 1076 1142 1004 90... https://www.amazon.com/dp/B088GT8QKC?ref=ppx_pop_mob_ap_share
+
*Air Horns
*Replacements for med kit
+
*Sea Sucker
+
*Loos gauge for shroud tensioning
+
*Spare O rings, clearly labeled (Gavin/Ryan--did we get these last fall?)
+
  
 
==Completed Tasks==
 
==Completed Tasks==
MIT
 
*Clean the dinghy motor propeller (October 2024 LM)
 
*Fix Running Lights (11-11-2024 SW)
 
**Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
 
*Inspect Sails (Oct. 2024)
 
*Running rigging replacement/maintenance (October 2024/April 2025)
 
*Clean boat thoroughly (Oct/Nov 2024; renewed April 2025)
 
*Vacuum bilges (21-04-2025 LM)
 
*Unclog galley sink (April 2025)
 
*Clean speed paddle wheel (April 2025)
 
*Retube or replace dinghy (replacement ordered spring 2025)
 
*Inspect/get replacements for safety gear (April 2025)
 
*Purchase:
 
**Boathook
 
**Deck brush
 
**Replacements for expired flares
 
*Inspect and maintain life vests (essential - Libby)
 
*Reinstall batteries in safety gear
 
*Wash rain gear (Scott)
 
*Wash cushion covers (Scott)
 
*2025 registrations for dinghy and Mashnee (Stew)
 
*2025 Ratings: PHRF and ORREZ (Adam)
 
*Jib furling line to cockpit (turned out to be easy to rig with a block soft-shackled to the bow cleats)
 
  
Dions
 
*Winterize engine (November 2024 Dions)
 
*Check wire rigging for deterioration (spiraling rust color) (safety - Dions)--shrouds replaced over winter
 
*Repair skylight hatch (functionality – Dions)
 
*Shave down companionway boards so they don’t stick (functionality – Dions)
 
*Engine realigned
 
*Oil and filter change (Dions)
 
*De-sludge fuel tank and clear out remaining water
 
*Winches serviced (Original ask: Grease sticky winch handle (and service winches?))
 
*Head repaired (Original ask: Winterize and clean head and water systems (Dions))
 
*Renew varnish: especially bowsprit, toerail, tiller, mast (Dions)
 
*Renew paint below waterline (Dions)
 
*Renew paint above waterline (likely ok for another season--check if actually done over winter)
 
*Zincs replaced
 
*Move brass hook for chartplotter (Dions?)
 
*Check discoloration under forestay tang spacer on mast for rot; re-bed spacer block so water can’t collect (safety – Dions)
 
  
North/Wally
+
==Task Lists from Past Seasons==
*Sail repairs at North (Scott has arranged):
+
**95: tears in luff boltrope, detaching spreader patch
+
**160: boltrope separating at head, small cuts near foot
+
**Main: general check; add flattening reef to raise boom
+
*Replace main sail cover (North/Wally)--cover stabilized with new fabric beneath worn parts
+
  
2025 Sailing Season
+
2024-2025: [[Task_List_2024-25|here]]
*Inspect tiller and rudderpost to diagnose odd feeling (Nothing commented over-winter; problem comes and goes; barnacle thesis appears to be reasonable)
+
*VHF/AIS issues
+
 
+
==Task Lists from Past Seasons==
+
  
 
2023-2024: [[Task_List_2023-24|here]]
 
2023-2024: [[Task_List_2023-24|here]]
  
 
2022-2023: [[Task_List_2022-23|here]]
 
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here