Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(Sails and canvas:)
(Rigging:)
 
(29 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
==Sailing Season Projects==
+
==2025 Sailing Season Projects==
  
==2024-25 Offseason work ==  
+
 
 +
==2025-26 Offseason Work ==  
  
 
Observations are listed on Discussion page
 
Observations are listed on Discussion page
  
 
===Hull and woodwork:===
 
===Hull and woodwork:===
*Renew varnish: especially bowsprit, toerail, tiller, mast (Dions)
+
*Renew Bottom Paint (Dions)
*Renew paint below waterline (Dions)
+
*Renew topsides paint (Dions)
*Renew paint above waterline (likely ok for another season)
+
*Maintain varnish on deck structures (Dions)
*Inspect tiller and rudderpost to diagnose odd feeling (Dions)
+
*Repair cracked/broken varnish on bowsprit (Dions)
*Repair skylight hatch (functionality – Dions)
+
*Inspect dark spots under fittings at top of mast for rot (Dions)
*Shave down companionway boards so they don’t stick (functionality – Dions)
+
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
*Plane edges of floor boards so they don’t stick (safety - Dions)
+
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
*Move brass hook for chartplotter (Dions?)
+
*Plane edges of soleboards/floorboards so they don't stick (Dions)
*Hatch top compass mount (Gavin)
+
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
*Porthole screen covers (Ted)
+
  
 
===Sails and canvas:===
 
===Sails and canvas:===
*Sail repairs at North:
+
*Repair 95 and 160 at North
**95: tears in luff boltrope, detaching spreader patch
+
*Patch working jib (MIT)
**160: boltrope separating at head, small cuts near foot
+
*Renew spreader patches on 160 (MIT)
*Replace main sail cover (North/Wally)
+
*Verify status of 140 and green spinnaker - are these still at North?
*Repair cabin top cover (North/Wally)
+
*Replace foot battens in 160 (North)
*New mast boot cover (Libby?)
+
*Price out top-down furler for spinnaker
*Minor sail repairs per observations on discussion page (MIT)
+
*New mast boot (Libby)
*Price out sail improvements (Adam)
+
**UV strip for 95
+
**Recutting foot of main to raise boom in cockpit ~8 inches
+
**Recutting 140 to 120
+
**Cruising 95 with no battens, UV strip
+
  
 
===Rigging:===
 
===Rigging:===
*Check discoloration under forestay tang spacer on mast for rot; re-bed spacer block so water can’t collect (safety – Dions)
+
*End for end mainsheet (Libby)
*Seal loose fibers at heel of mast against rot (safety – Dions)
+
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
*Check wire rigging for deterioration (spiraling rust color) (safety - Dions)
+
**Probably: replace topping lift and/or main halyard (MIT - Dan)
*Check condition of bronze on chain plates below deck (safety - Dions)
+
*Repair/replace jib car pins
*Running rigging replacement/maintenance (Libby)
+
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
*Fix springs in jib car pins
+
*Thump mat or puddening for Code Zero furler (MIT)
*Grease sticky winch handle (and service winches?)
+
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
*Top cap for furler foil
+
*Re-seat pin holding lower end of bobstay (Dions)
*Gear for spinnaker peels (Adam)
+
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
*Jib furling line to cockpit (wish list)
+
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
*Messenger lines for halyards (wish list)
+
  
 
===Engine:===
 
===Engine:===
*De-sludge fuel tank and clear out remaining water (Dions, or Dion’s recommendation)
+
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 
*Change raw water impeller (Dions)
 
*Change raw water impeller (Dions)
*Oil and filter change (Dions - underway)
+
*Change zincs (Dions)
  
 
===Systems:===
 
===Systems:===
*Winterize and clean head and water systems (Dions)
+
 
*Unclog galley sink (Ted)
+
*Fix leak in bilge pump outflow (should be within MIT capabilities)
*Clean speed paddle wheel (Ted)
+
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
*Price doppler boat speed alternative (Ryan)
+
*Replace joker valve proactively (MIT)
*Wireless instrument broadcast (Adam)
+
*Find wireless instruments
+
*Backup nav lights (Adam)
+
*Check wind index for bird damage (Dions?)
+
*Put batteries on trickle charger?
+
*Download B&G data (Adam)
+
  
 
===Gear:===
 
===Gear:===
*Retube or replace dinghy (essential - Gavin/Stew)
+
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
*Inspect and maintain life vests (essential - Libby)
+
*Check/replace safety gear (essential – Libby)
+
*Wash rain gear (Scott)
+
*Wash cushion covers (Scott)
+
  
 
===Admin:===
 
===Admin:===
*2025 registrations for dinghy and Mashnee (Stew)
+
*Renew registration for Mashnee and dinghy
*2025 Ratings: PHRF and ORREZ (Adam)
+
*Get copies of Safe Boating Certificates for all skippers to keep on boat
  
 
===Shopping List===
 
===Shopping List===
*Green bulbs for running lights: Makergroup 1076 1142 1004 90... https://www.amazon.com/dp/B088GT8QKC?ref=ppx_pop_mob_ap_share
+
*Air Horns
*Replacements for expired flares
+
*Replacements for med kit
+
*Boathook
+
*Deck brush
+
*Sea Sucker
+
*Loos gauge for shroud tensioning
+
*Spare O rings, clearly labeled (Gavin/Ryan)
+
 
+
  
 
==Completed Tasks==
 
==Completed Tasks==
MIT
 
*Clean the dinghy motor propeller (October 2024 LM)
 
*Fix Running Lights (11-11-2024 SW)
 
**Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
 
*Inspect Sails (Oct. 2024)
 
*Clean boat thoroughly (Oct/Nov 2024)
 
  
Dions
 
*Winterize engine (November 2024 Dions)
 
  
 
==Task Lists from Past Seasons==
 
==Task Lists from Past Seasons==
 +
 +
2024-2025: [[Task_List_2024-25|here]]
  
 
2023-2024: [[Task_List_2023-24|here]]
 
2023-2024: [[Task_List_2023-24|here]]
  
 
2022-2023: [[Task_List_2022-23|here]]
 
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here