Difference between revisions of "Mashnee task list"
From MITNA
(→Rigging:) |
|||
| (32 intermediate revisions by 2 users not shown) | |||
| Line 3: | Line 3: | ||
Please use the discussion page to discuss the prioritization and content of any of these tasks. | Please use the discussion page to discuss the prioritization and content of any of these tasks. | ||
| − | ==Sailing Season Projects== | + | ==2025 Sailing Season Projects== |
| − | == | + | ==2025-26 Offseason Work == |
| − | |||
Observations are listed on Discussion page | Observations are listed on Discussion page | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | === | + | ===Hull and woodwork:=== |
| − | *Inspect | + | *Renew Bottom Paint (Dions) |
| − | ** | + | *Renew topsides paint (Dions) |
| − | * | + | *Maintain varnish on deck structures (Dions) |
| − | * | + | *Repair cracked/broken varnish on bowsprit (Dions) |
| − | * | + | *Inspect dark spots under fittings at top of mast for rot (Dions) |
| − | * | + | **Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe |
| − | *Change raw water impeller | + | *Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions) |
| − | * | + | *Plane edges of soleboards/floorboards so they don't stick (Dions) |
| − | * | + | *Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion) |
| − | * | + | |
| − | * | + | ===Sails and canvas:=== |
| + | *Repair 95 and 160 at North | ||
| + | *Patch working jib (MIT) | ||
| + | *Renew spreader patches on 160 (MIT) | ||
| + | *Verify status of 140 and green spinnaker - are these still at North? | ||
| + | *Replace foot battens in 160 (North) | ||
| + | *Price out top-down furler for spinnaker | ||
| + | *New mast boot (Libby) | ||
| + | |||
| + | ===Rigging:=== | ||
| + | *End for end mainsheet (Libby) | ||
| + | *Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT) | ||
| + | **Probably: replace topping lift and/or main halyard (MIT - Dan) | ||
| + | *Repair/replace jib car pins | ||
| + | *Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?) | ||
| + | *Thump mat or puddening for Code Zero furler (MIT) | ||
| + | *See if we can remove a shackle from the backstay to allow for better tensioning (MIT?) | ||
| + | *Re-seat pin holding lower end of bobstay (Dions) | ||
| + | *Inspect fitting that holds forestay to bowsprit for rust (Dions) | ||
| + | *Add correct fitting to top of jib furler foil, to prevent wear against the stay | ||
| + | |||
| + | ===Engine:=== | ||
| + | *Winterize engine (Dions) | ||
| + | *Change oil and filters (Dions) | ||
| + | *Change raw water impeller (Dions) | ||
| + | *Change zincs (Dions) | ||
| + | |||
| + | ===Systems:=== | ||
| + | |||
| + | *Fix leak in bilge pump outflow (should be within MIT capabilities) | ||
| + | *Renew gasket/insulation around edge of the forward engine comparment/companionway stairs | ||
| + | *Replace joker valve proactively (MIT) | ||
| + | |||
| + | ===Gear:=== | ||
| + | *New inflator for DanBuoy (got a new cartridge summer 2025; not installed) | ||
| + | |||
| + | ===Admin:=== | ||
| + | *Renew registration for Mashnee and dinghy | ||
| + | *Get copies of Safe Boating Certificates for all skippers to keep on boat | ||
===Shopping List=== | ===Shopping List=== | ||
| − | * | + | *Air Horns |
| − | + | ||
| − | + | ||
==Completed Tasks== | ==Completed Tasks== | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
==Task Lists from Past Seasons== | ==Task Lists from Past Seasons== | ||
| + | |||
| + | 2024-2025: [[Task_List_2024-25|here]] | ||
2023-2024: [[Task_List_2023-24|here]] | 2023-2024: [[Task_List_2023-24|here]] | ||
2022-2023: [[Task_List_2022-23|here]] | 2022-2023: [[Task_List_2022-23|here]] | ||
Latest revision as of 09:13, 3 December 2025
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.
Contents
2025 Sailing Season Projects
2025-26 Offseason Work
Observations are listed on Discussion page
Hull and woodwork:
- Renew Bottom Paint (Dions)
- Renew topsides paint (Dions)
- Maintain varnish on deck structures (Dions)
- Repair cracked/broken varnish on bowsprit (Dions)
- Inspect dark spots under fittings at top of mast for rot (Dions)
- Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
- Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
- Plane edges of soleboards/floorboards so they don't stick (Dions)
- Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
Sails and canvas:
- Repair 95 and 160 at North
- Patch working jib (MIT)
- Renew spreader patches on 160 (MIT)
- Verify status of 140 and green spinnaker - are these still at North?
- Replace foot battens in 160 (North)
- Price out top-down furler for spinnaker
- New mast boot (Libby)
Rigging:
- End for end mainsheet (Libby)
- Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
- Probably: replace topping lift and/or main halyard (MIT - Dan)
- Repair/replace jib car pins
- Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
- Thump mat or puddening for Code Zero furler (MIT)
- See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
- Re-seat pin holding lower end of bobstay (Dions)
- Inspect fitting that holds forestay to bowsprit for rust (Dions)
- Add correct fitting to top of jib furler foil, to prevent wear against the stay
Engine:
- Winterize engine (Dions)
- Change oil and filters (Dions)
- Change raw water impeller (Dions)
- Change zincs (Dions)
Systems:
- Fix leak in bilge pump outflow (should be within MIT capabilities)
- Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
- Replace joker valve proactively (MIT)
Gear:
- New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
Admin:
- Renew registration for Mashnee and dinghy
- Get copies of Safe Boating Certificates for all skippers to keep on boat
Shopping List
- Air Horns
Completed Tasks
Task Lists from Past Seasons
2024-2025: here
2023-2024: here
2022-2023: here