Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(Projects from observations)
(Rigging:)
 
(33 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
==Sailing Season Projects==
+
==2025 Sailing Season Projects==
  
  
==2024-25 Offseason work ==  
+
==2025-26 Offseason Work ==  
  
===Projects from observations===
 
 
Observations are listed on Discussion page
 
Observations are listed on Discussion page
*New mainsail cover
 
*Patch or replace main hatch cover
 
*New mast boot cover
 
*Major dinghy repair or replacement
 
*Fix crack and re-affix hardware on main cabin skylight
 
*Plane edges of sole boards (bilge boards/floorboards) so they don't stick and impede access to bilge
 
*Varnish the tiller
 
*Clean paddlewheel (speed sensor?)
 
*Download B&G data
 
*Messenger lines for halyards
 
*Attend to mast problem areas under forestay tang and at heel (Dions)
 
*Fix springs in three of the jib cars
 
*Get and install top cap for jib furler foil
 
*Fix sticky winch handle and stabilize broken plastic part
 
  
===Projected work based on routine intervals===
+
===Hull and woodwork:===
*Inspect running rigging; make replacement list
+
*Renew Bottom Paint (Dions)
**Consider the main halyard chafe--this will likely need replacement
+
*Renew topsides paint (Dions)
*Inspect standing rigging (us or Dions?); assess lifespan
+
*Maintain varnish on deck structures (Dions)
*Replace last two inflatable PFDs (2024 will be their 10th season)
+
*Repair cracked/broken varnish on bowsprit (Dions)
*Renew mast varnish (Dions has started Nov. 2024)
+
*Inspect dark spots under fittings at top of mast for rot (Dions)
*Oil and filter change on engine
+
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
*Change raw water impeller on engine
+
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
*Winterize and clean fuel/fuel tank
+
*Plane edges of soleboards/floorboards so they don't stick (Dions)
*Winterize and clean the head
+
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
*Launder interior fabrics
+
 
 +
===Sails and canvas:===
 +
*Repair 95 and 160 at North
 +
*Patch working jib (MIT)
 +
*Renew spreader patches on 160 (MIT)
 +
*Verify status of 140 and green spinnaker - are these still at North?
 +
*Replace foot battens in 160 (North)
 +
*Price out top-down furler for spinnaker
 +
*New mast boot (Libby)
 +
 
 +
===Rigging:===
 +
*End for end mainsheet (Libby)
 +
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
 +
**Probably: replace topping lift and/or main halyard (MIT - Dan)
 +
*Repair/replace jib car pins
 +
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
 +
*Thump mat or puddening for Code Zero furler (MIT)
 +
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
 +
*Re-seat pin holding lower end of bobstay (Dions)
 +
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
 +
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
 +
 
 +
===Engine:===
 +
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 +
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
 +
 
 +
===Systems:===
 +
 
 +
*Fix leak in bilge pump outflow (should be within MIT capabilities)
 +
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
 +
*Replace joker valve proactively (MIT)
 +
 
 +
===Gear:===
 +
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
 +
 
 +
===Admin:===
 +
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
  
 
===Shopping List===
 
===Shopping List===
*Green bulbs for running lights: Makergroup 1076 1142 1004 90... https://www.amazon.com/dp/B088GT8QKC?ref=ppx_pop_mob_ap_share
+
*Air Horns
*Replacements for expired flares
+
*Replacements for med kit
+
  
 
==Completed Tasks==
 
==Completed Tasks==
MIT
 
*Clean the dinghy motor propeller (October 2024 LM)
 
*Fix Running Lights (11-11-2024 SW)
 
**Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
 
*Inspect Sails (Oct. 2024)
 
*Clean boat thoroughly (Oct/Nov 2024)
 
  
Dions
 
*Winterize engine (November 2024 Dions)
 
  
 
==Task Lists from Past Seasons==
 
==Task Lists from Past Seasons==
 +
 +
2024-2025: [[Task_List_2024-25|here]]
  
 
2023-2024: [[Task_List_2023-24|here]]
 
2023-2024: [[Task_List_2023-24|here]]
  
 
2022-2023: [[Task_List_2022-23|here]]
 
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here