Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(New Work)
 
(22 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
 +
==Sailing Season Projects==
  
=2023-2024 offseason work =  
+
==2024-25 Offseason work ==  
  
Note: Most items on this list are based on post-haul out observations, which are listed on the discussion page.
+
Observations are listed on Discussion page
  
== Inspections (items probably outside MIT knowledge base)==
+
===Hull and woodwork:===
* Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
+
*Inspect tiller and rudderpost to diagnose odd feeling (Dions)
* Deck joints around chainplates
+
*Plane edges of floor boards so they don’t stick (safety - Dions)
* Mast just under the forestay tang for incipient rot
+
*Move brass hook for chartplotter (Dions?)
* Cutlass bearings
+
*Hatch top compass mount (Gavin)
 +
*Porthole screen covers (Ted)
  
== Maintenance/Renewals ==
+
===Sails and canvas:===
* Varnish mast
+
*Sail repairs at North (Scott has arranged):
* Varnish bowsprit
+
**95: tears in luff boltrope, detaching spreader patch
* Varnish cockpit coamings
+
**160: boltrope separating at head, small cuts near foot
* Clean propeller
+
**Main: general check; add flattening reef to raise boom
* Winterize engine, freshwater system, and blackwater
+
**Recutting 140 to 120
* Change fuel filters and impeller
+
*Replace main sail cover (North/Wally)
 +
*Repair cabin top cover (North/Wally)
 +
*New mast boot cover (Libby?)
 +
*Minor sail repairs per observations on discussion page (MIT)
 +
*Price out sail improvements (Adam)
 +
**UV strip for 95
 +
**Cruising 95 with no battens, UV strip
  
== Repairs ==
+
===Rigging:===
* Cabin hatch top
+
*Check discoloration under forestay tang spacer on mast for rot; re-bed spacer block so water can’t collect (safety – Dions)
* Shave edges from weatherboards to alleviate sticking and jamming
+
*Seal loose fibers at heel of mast against rot (safety – Dions)
* Repair porthole screens; clean gaskets and threads around portholes
+
*Check condition of bronze on chain plates below deck (safety - Dions)
* Fill holes on lazarette and bow hatch strut attachment and re-install
+
*Fix springs in jib car pins
* Shorten reefing hook
+
*Top cap for furler foil
* Check/repair bilge pump wiring
+
*Gear for spinnaker peels (Adam)
* Sail repairs: tears in 140 and 95 jibs
+
*Jib furling line to cockpit (wish list)
 +
*Messenger lines for halyards (wish list)
  
== Gear Replacements ==
+
===Engine:===
* New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [https://www.neropes.com/products/traditional-rigging/product/detail/spun-classic/])
+
*Change raw water impeller (Dions)
* New jib sheets (60', 9/16 polyester double braid)
+
* New topping lift
+
* New mast boot
+
  
== New Work ==
+
===Systems:===
 +
*Wireless instrument broadcast (Adam)
 +
*Find wireless instruments
 +
*Backup nav lights (Adam)
 +
*Check wind index for bird damage (Dions?)
 +
*Put batteries on trickle charger?
 +
*Download B&G data (Adam)
 +
*Price doppler boat speed alternative (Ryan)
  
= Budget for Next Year =
+
===Gear:===
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
*Inspect and maintain life vests (essential - Libby)
 +
*Reinstall batteries in safety gear
 +
*New inflator for DanBuoy (requested--follow up)
 +
*Wash rain gear (Scott)
 +
*Wash cushion covers (Scott)
  
 +
===Admin:===
 +
*2025 registrations for dinghy and Mashnee (Stew)
 +
*2025 Ratings: PHRF and ORREZ (Adam)
  
== Completed Tasks ==
+
===Shopping List===
 +
*Green bulbs for running lights: Makergroup 1076 1142 1004 90... https://www.amazon.com/dp/B088GT8QKC?ref=ppx_pop_mob_ap_share
 +
*Replacements for med kit
 +
*Sea Sucker
 +
*Loos gauge for shroud tensioning
 +
*Spare O rings, clearly labeled (Gavin/Ryan--did we get these last fall?)
  
 +
==Completed Tasks==
 +
MIT
 +
*Clean the dinghy motor propeller (October 2024 LM)
 +
*Fix Running Lights (11-11-2024 SW)
 +
**Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
 +
*Inspect Sails (Oct. 2024)
 +
*Running rigging replacement/maintenance (October 2024/April 2025)
 +
*Clean boat thoroughly (Oct/Nov 2024; renewed April 2025)
 +
*Vacuum bilges (21-04-2025 LM)
 +
*Unclog galley sink (April 2025)
 +
*Clean speed paddle wheel (April 2025)
 +
*Retube or replace dinghy (replacement ordered spring 2025)
 +
*Inspect/get replacements for safety gear (April 2025)
 +
*Purchase:
 +
**Boathook
 +
**Deck brush
 +
**Replacements for expired flares
  
= From 2023 Season =
+
Dions
 +
*Winterize engine (November 2024 Dions)
 +
*Check wire rigging for deterioration (spiraling rust color) (safety - Dions)--shrouds replaced over winter
 +
*Repair skylight hatch (functionality – Dions)
 +
*Shave down companionway boards so they don’t stick (functionality – Dions)
 +
*Engine realigned
 +
*Oil and filter change (Dions)
 +
*De-sludge fuel tank and clear out remaining water
 +
*Winches serviced (Original ask: Grease sticky winch handle (and service winches?))
 +
*Head repaired (Original ask: Winterize and clean head and water systems (Dions))
 +
*Renew varnish: especially bowsprit, toerail, tiller, mast (Dions)
 +
*Renew paint below waterline (Dions)
 +
*Renew paint above waterline (likely ok for another season--check if actually done over winter)
 +
*Zincs replaced
  
All tasks unfinished at the end of the 2023 sailing season are [[Task_List_2022-23|here]] for reference.  Please copy anything still relevant back to this page.
+
==Task Lists from Past Seasons==
 +
 
 +
2023-2024: [[Task_List_2023-24|here]]
 +
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 16:37, 21 April 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

Sailing Season Projects

2024-25 Offseason work

Observations are listed on Discussion page

Hull and woodwork:

  • Inspect tiller and rudderpost to diagnose odd feeling (Dions)
  • Plane edges of floor boards so they don’t stick (safety - Dions)
  • Move brass hook for chartplotter (Dions?)
  • Hatch top compass mount (Gavin)
  • Porthole screen covers (Ted)

Sails and canvas:

  • Sail repairs at North (Scott has arranged):
    • 95: tears in luff boltrope, detaching spreader patch
    • 160: boltrope separating at head, small cuts near foot
    • Main: general check; add flattening reef to raise boom
    • Recutting 140 to 120
  • Replace main sail cover (North/Wally)
  • Repair cabin top cover (North/Wally)
  • New mast boot cover (Libby?)
  • Minor sail repairs per observations on discussion page (MIT)
  • Price out sail improvements (Adam)
    • UV strip for 95
    • Cruising 95 with no battens, UV strip

Rigging:

  • Check discoloration under forestay tang spacer on mast for rot; re-bed spacer block so water can’t collect (safety – Dions)
  • Seal loose fibers at heel of mast against rot (safety – Dions)
  • Check condition of bronze on chain plates below deck (safety - Dions)
  • Fix springs in jib car pins
  • Top cap for furler foil
  • Gear for spinnaker peels (Adam)
  • Jib furling line to cockpit (wish list)
  • Messenger lines for halyards (wish list)

Engine:

  • Change raw water impeller (Dions)

Systems:

  • Wireless instrument broadcast (Adam)
  • Find wireless instruments
  • Backup nav lights (Adam)
  • Check wind index for bird damage (Dions?)
  • Put batteries on trickle charger?
  • Download B&G data (Adam)
  • Price doppler boat speed alternative (Ryan)

Gear:

  • Inspect and maintain life vests (essential - Libby)
  • Reinstall batteries in safety gear
  • New inflator for DanBuoy (requested--follow up)
  • Wash rain gear (Scott)
  • Wash cushion covers (Scott)

Admin:

  • 2025 registrations for dinghy and Mashnee (Stew)
  • 2025 Ratings: PHRF and ORREZ (Adam)

Shopping List

Completed Tasks

MIT

  • Clean the dinghy motor propeller (October 2024 LM)
  • Fix Running Lights (11-11-2024 SW)
    • Replace the starboard bow light (is this separate from fixing it for the season? Was not completed as a separate task)
  • Inspect Sails (Oct. 2024)
  • Running rigging replacement/maintenance (October 2024/April 2025)
  • Clean boat thoroughly (Oct/Nov 2024; renewed April 2025)
  • Vacuum bilges (21-04-2025 LM)
  • Unclog galley sink (April 2025)
  • Clean speed paddle wheel (April 2025)
  • Retube or replace dinghy (replacement ordered spring 2025)
  • Inspect/get replacements for safety gear (April 2025)
  • Purchase:
    • Boathook
    • Deck brush
    • Replacements for expired flares

Dions

  • Winterize engine (November 2024 Dions)
  • Check wire rigging for deterioration (spiraling rust color) (safety - Dions)--shrouds replaced over winter
  • Repair skylight hatch (functionality – Dions)
  • Shave down companionway boards so they don’t stick (functionality – Dions)
  • Engine realigned
  • Oil and filter change (Dions)
  • De-sludge fuel tank and clear out remaining water
  • Winches serviced (Original ask: Grease sticky winch handle (and service winches?))
  • Head repaired (Original ask: Winterize and clean head and water systems (Dions))
  • Renew varnish: especially bowsprit, toerail, tiller, mast (Dions)
  • Renew paint below waterline (Dions)
  • Renew paint above waterline (likely ok for another season--check if actually done over winter)
  • Zincs replaced

Task Lists from Past Seasons

2023-2024: here

2022-2023: here