Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
 +
==2025 Sailing Season Projects==
  
=2023-2024 offseason work =
 
  
Note: Most items on this list are based on post-haul out observations, which are listed on the discussion page.
+
==2025-26 Offseason Work ==
  
== Inspections (items probably outside MIT knowledge base)==
+
Observations are listed on Discussion page
* Assess corrosion on chainplates, particularly where it is heaviest near the stainless steel diagonal supports
+
* Deck joints around chainplates
+
* Mast just under the forestay tang for incipient rot
+
* Cutlass bearings
+
  
== Maintenance/Renewals ==
+
===Hull and woodwork:===
* Varnish mast
+
*Renew Bottom Paint (Dions)
* Varnish bowsprit
+
*Renew topsides paint (Dions)
* Varnish cockpit coamings
+
*Maintain varnish on deck structures (Dions)
* Clean propeller
+
*Repair cracked/broken varnish on bowsprit (Dions)
* Winterize engine, freshwater system, and blackwater
+
*Inspect dark spots under fittings at top of mast for rot (Dions)
* Change fuel filters and impeller
+
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
 +
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
 +
*Plane edges of soleboards/floorboards so they don't stick (Dions)
 +
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
  
== Repairs ==
+
===Sails and canvas:===
* Cabin hatch top
+
*Repair 95 and 160 at North
* Shave edges from weatherboards to alleviate sticking and jamming
+
*Patch working jib (MIT)
* Repair porthole screens; clean gaskets and threads around portholes
+
*Renew spreader patches on 160 (MIT)
* Fill holes on lazarette and bow hatch strut attachment and re-install
+
*Verify status of 140 and green spinnaker - are these still at North?
* Shorten reefing hook
+
*Replace foot battens in 160 (North)
* Check/repair bilge pump wiring
+
*Price out top-down furler for spinnaker
* Sail repairs: tears in 140 and 95 jibs
+
*New mast boot (Libby)
  
== Gear Replacements ==
+
===Rigging:===
* New main sheet (three-strand works well - 90', 9/16" three-strand: New England Ropes Spun Classic or equivalent [https://www.neropes.com/products/traditional-rigging/product/detail/spun-classic/])
+
*End for end mainsheet (Libby)
* New jib sheets (60', 9/16 polyester double braid)
+
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
* New topping lift
+
**Probably: replace topping lift and/or main halyard (MIT - Dan)
* New mast boot
+
*Repair/replace jib car pins
 +
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
 +
*Thump mat or puddening for Code Zero furler (MIT)
 +
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
 +
*Re-seat pin holding lower end of bobstay (Dions)
 +
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
 +
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
  
== New Work ==
+
===Engine:===
* Install hardwired CO detector
+
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 +
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
  
= Budget for Next Year =
+
===Systems:===
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
  
 +
*Fix leak in bilge pump outflow (should be within MIT capabilities)
 +
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
 +
*Replace joker valve proactively (MIT)
  
== Completed Tasks ==
+
===Gear:===
 +
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
  
 +
===Admin:===
 +
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
  
= From 2023 Season =
+
===Shopping List===
 +
*Air Horns
  
All tasks unfinished at the end of the 2023 sailing season are [[Task_List_2022-23|here]] for reference.  Please copy anything still relevant back to this page.
+
==Completed Tasks==
 +
 
 +
 
 +
==Task Lists from Past Seasons==
 +
 
 +
2024-2025: [[Task_List_2024-25|here]]
 +
 
 +
2023-2024: [[Task_List_2023-24|here]]
 +
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns