Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(2023-2024 offseason work)
(Rigging:)
 
(53 intermediate revisions by 3 users not shown)
Line 3: Line 3:
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
 +
==2025 Sailing Season Projects==
  
=2023-2024 offseason work =
 
* Porthole screen repair
 
* Clean porthole gaskets
 
* Install hardwired CO detector
 
* New jib sheets (60', 9/16 polyester double braid)
 
* New main sheet (three-strand works well - 90', 9/16" three-strand)
 
* Fill holes on lazarette and bow hatch strut attachment and re-install
 
* Repair companionway top hatch
 
* Asses + repair companionway slider
 
* Replace topping lift (or at least inspect)
 
  
= Budget for Next Year =
+
==2025-26 Offseason Work ==
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
  
= From 2023 Season =
+
Observations are listed on Discussion page
= MIT Work =
+
  
* Calibrate all instruments following factory procedures (https://pdf.nauticexpo.com/pdf/b-g/quick-guide-to-instrument-calibration/21524-2087.html)
+
===Hull and woodwork:===
* Remove speed sensor and clean
+
*Renew Bottom Paint (Dions)
* Get Raymarine wireless displays talking to H5000 again
+
*Renew topsides paint (Dions)
* Get AIS displaying on Zues3S
+
*Maintain varnish on deck structures (Dions)
* Put radar connector in more waterproof and secure location in lazarette locker
+
*Repair cracked/broken varnish on bowsprit (Dions)
* Repair 140 leech
+
*Inspect dark spots under fittings at top of mast for rot (Dions)
* SOP + pictures of jackline setup
+
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
* Bungees on head hatch - Gavin
+
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
* Replace latch on dinghy bow hatch (new latch onboard Mashnee)
+
*Plane edges of soleboards/floorboards so they don't stick (Dions)
* Hand stitch the 95 Jib luff again?
+
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
* Scrub bilges around engine with Dawn or Joy to remove fuel leak residue
+
* Grease companionway tracks
+
* Improving reefing setup at tack
+
* Come up with better organization for fenders, docklines
+
  
= Off-Season Work =  
+
===Sails and canvas:===
 +
*Repair 95 and 160 at North
 +
*Patch working jib (MIT)
 +
*Renew spreader patches on 160 (MIT)
 +
*Verify status of 140 and green spinnaker - are these still at North?
 +
*Replace foot battens in 160 (North)
 +
*Price out top-down furler for spinnaker
 +
*New mast boot (Libby)
  
* Mounting for compass? New compass?
+
===Rigging:===
* Working jib - bolt rope on the luff frayed near the head - fix
+
*End for end mainsheet (Libby)
* Stitch zipper stops for all sail bags
+
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
* Cunningham purchase system to easily be soft shackled on when needed - carabiner?
+
**Probably: replace topping lift and/or main halyard (MIT - Dan)
* Longer jib furling line to let us lead it aft? Soft shackle fairlead?
+
*Repair/replace jib car pins
* Ring-dings for turnbuckles
+
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
* Replace eye for lee cloth on port berth
+
*Thump mat or puddening for Code Zero furler (MIT)
* Repair screen on the starboard and port portholes
+
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
* Better reefing hook
+
*Re-seat pin holding lower end of bobstay (Dions)
* Replace jib sheets with the same type of line
+
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
* Swap spin halyards so red flecked is the port side
+
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
* Add eyes to mast? Gavin has idea?
+
* More permanent repair to companionway screen (+ better place to store)  
+
* Clean up wood around bilge panels for easier access
+
* Get all around white light for dinghy at night?
+
  
= Dion's Work =
+
===Engine:===
 +
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 +
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
  
*Get 1" half oval from Hamilton for Centerboard Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
+
===Systems:===
* Replace topping lift dyneema line
+
* to confirm: The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls
+
* Polish fuel tank- Boat should arrive with less than 1/3 tank
+
* Replace or repair two bent stanchions
+
* Service propeller
+
* inspect cutlass bearing (lots of noise from propeller)
+
  
= North Work =
+
*Fix leak in bilge pump outflow (should be within MIT capabilities)
* We need a new canvas boot for the mast-deck connection.
+
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
* Repairs to 140?
+
*Replace joker valve proactively (MIT)
* Repairs to mainsail cover
+
 
 +
===Gear:===
 +
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
 +
 
 +
===Admin:===
 +
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
 +
 
 +
===Shopping List===
 +
*Air Horns
 +
 
 +
==Completed Tasks==
 +
 
 +
 
 +
==Task Lists from Past Seasons==
 +
 
 +
2024-2025: [[Task_List_2024-25|here]]
 +
 
 +
2023-2024: [[Task_List_2023-24|here]]
 +
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here