Difference between revisions of "Mashnee task list"

From MITNA
Jump to: navigation, search
(MIT Work)
(Rigging:)
 
(69 intermediate revisions by 3 users not shown)
Line 2: Line 2:
  
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
= MIT Work =
 
* Attach hatch struts on bow and lazarette hatches
 
* Hand stitch the 95 Jib luff again
 
* Scrub bilges around engine with Dawn or Joy to remove fuel leak residue
 
* Put radar connector in more waterproof and secure location in lazarette locker
 
* Replace latch on dinghy bow hatch (new latch onboard Mashnee)
 
* Bungees on head hatch - Gavin
 
* Mounting for compass? New compass?
 
* Working jib - bolt rope on the luff frayed near the head - fix
 
* Stitch zipper stops for all sail bags
 
* Cunningham purchase system to easily be soft shackled on when needed - carabiner?
 
* Longer jib furling line to let us lead it aft? Soft shackle fairlead?
 
* Ring-dings for turnbuckles
 
* Replace eye for lee cloth on port berth
 
* Repair screen on the starboard porthole
 
* More permanent repair to companionway screen (+ better place to store)
 
* Add spreader patches to new 95 jib?
 
* Clean up wood around bilge panels for easier access
 
* Grease companionway tracks
 
* Spruce up soundproofing around the engine
 
* Enlarge spreader patches after repair on 160
 
* SOP + pictures of jackline setup
 
  
= Dion's Work =
+
==2025 Sailing Season Projects==
  
*Get 1" half oval from Hamilton for Centerboard Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
 
* Replace topping lift dyneema line
 
* We need a new (3rd) cowl vent, one went missing at the start of the season.
 
* to confirm: The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls
 
* Polish fuel tank- Boat should arrive with less than 1/3 tank
 
* Replace or repair two bent stanchions
 
  
= North Work =
+
==2025-26 Offseason Work ==
* We need a new canvas boot for the mast-deck connection.
+
* Two little covers for furler line port.
+
  
 +
Observations are listed on Discussion page
  
 +
===Hull and woodwork:===
 +
*Renew Bottom Paint (Dions)
 +
*Renew topsides paint (Dions)
 +
*Maintain varnish on deck structures (Dions)
 +
*Repair cracked/broken varnish on bowsprit (Dions)
 +
*Inspect dark spots under fittings at top of mast for rot (Dions)
 +
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
 +
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
 +
*Plane edges of soleboards/floorboards so they don't stick (Dions)
 +
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
  
= Budget for Next Year =
+
===Sails and canvas:===
* New jib sheets (60', 9/16 polyester double braid)
+
*Repair 95 and 160 at North
* New main sheet (three-strand works well)
+
*Patch working jib (MIT)
* Replace last two inflatable PFDs (2024 will be their 10th season)
+
*Renew spreader patches on 160 (MIT)
 +
*Verify status of 140 and green spinnaker - are these still at North?
 +
*Replace foot battens in 160 (North)
 +
*Price out top-down furler for spinnaker
 +
*New mast boot (Libby)
 +
 
 +
===Rigging:===
 +
*End for end mainsheet (Libby)
 +
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
 +
**Probably: replace topping lift and/or main halyard (MIT - Dan)
 +
*Repair/replace jib car pins
 +
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
 +
*Thump mat or puddening for Code Zero furler (MIT)
 +
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
 +
*Re-seat pin holding lower end of bobstay (Dions)
 +
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
 +
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
 +
 
 +
===Engine:===
 +
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 +
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
 +
 
 +
===Systems:===
 +
 
 +
*Fix leak in bilge pump outflow (should be within MIT capabilities)
 +
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
 +
*Replace joker valve proactively (MIT)
 +
 
 +
===Gear:===
 +
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
 +
 
 +
===Admin:===
 +
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
 +
 
 +
===Shopping List===
 +
*Air Horns
 +
 
 +
==Completed Tasks==
 +
 
 +
 
 +
==Task Lists from Past Seasons==
 +
 
 +
2024-2025: [[Task_List_2024-25|here]]
 +
 
 +
2023-2024: [[Task_List_2023-24|here]]
 +
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here