| (82 intermediate revisions by 3 users not shown) |
| Line 3: |
Line 3: |
| | Please use the discussion page to discuss the prioritization and content of any of these tasks. | | Please use the discussion page to discuss the prioritization and content of any of these tasks. |
| | | | |
| − | == Pre-storage (fall) tasks == | + | ==2025 Sailing Season Projects== |
| − | * Lay out all sails and look for any issues
| + | |
| − | * Dry the spare lines, spinnakers, and anything else that’s wet, especially if they will be stored somewhere without air circulation
| + | |
| − | * Inspect all lines, rig hardware, and spars before storing them for the winter
| + | |
| − | * Inspect and inventory safety gear, medical kit, etc.
| + | |
| − | * Inventory spare parts and make list of needed replacements
| + | |
| − | * Scrub bilges around engine with Joy to remove fuel leak residue
| + | |
| − | * Remove knives -- Gavin to resharpen
| + | |
| | | | |
| − | Organize bins:
| |
| − | * Kitchen stuff
| |
| − | * Foulies
| |
| − | * PFDs + tethers
| |
| − | * Books / charts / nav equipment + medical kits + safety equipment
| |
| − | * Cleaning supplies
| |
| − | * Lines
| |
| − | * Spares from under the forward berth
| |
| | | | |
| − | = Dion's Work = | + | ==2025-26 Offseason Work == |
| − | ==Centerboard== | + | |
| − | *Plan is to pull the board right away when hauled.
| + | |
| − | *Grind off head until it swings easily through wood on top of the lead keel while swelled up. Put the boat back into water to make certain it swings freely with the box wet and swollen up. Remove board again and glass up properly and install downhaul line up through the tube to the cabin top as well. New bright red paint.
| + | |
| − | *Get 1" half oval from Hamilton for Gasket Plates. Two 8' pieces... Cut to fit. Drill and counter sink for 1/4" screws on drill press. Install gasket beneath. Mark edges then, remove and re-cut gasket with hot knife. Then finally install...
| + | |
| | | | |
| − | == Rigging, Hull, Motor ==
| + | Observations are listed on Discussion page |
| − | * Replace spreader lights - convert to LEDs with lower profile, mount them better. Dions
| + | |
| − | * We need a new (3rd) cowl vent, one went missing at the start of the season. Dions
| + | |
| − | * Inspect all standing rigging, grease Furlex bearings top and bottom
| + | |
| − | * All the hatch hinges need to be strengthened, replaced and/or repaired. We had water intrusion and loss of almost all of them this year (I think it was time catching up to them?) Dions
| + | |
| − | * The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached. Thru bolted in bronze pls Dions
| + | |
| − | * The whole inside of the hull needs to be gone over, especially in the cockpit lockers. There was significant mold/mildew buildup. (We did a first round in November. Dions in Spring?)
| + | |
| − | * Scrub bilges around engine with Dawn or Joy to remove fuel leak residue (we can also do this)
| + | |
| − | * Create a way to hold the lid under the forepeak berth open when rummaging for supplies. Dions
| + | |
| − | * Topsides touch-up again? Re-paint next year? Check plank ends at transom, please.
| + | |
| − | * Bottom paint, What brands are best? Sea Hawk?
| + | |
| − | * Varnish- Cabin top, toe rails, coamings, tiller, companionways, hatches, spars- Interior surfaces?
| + | |
| − | * Winterize engine and all water systems
| + | |
| − | * Motor- Change oil and filter. Leave spare filter on board
| + | |
| − | * Replace low-pressure engine oil line near on-engine fuel filter that has a nick and slow oil leak. It is getting worse. (+ reattach to prevent chafe; check other lines for potential chafe).
| + | |
| − | * Check forward starboard engine mount- seems off
| + | |
| − | * Polish fuel tank- Boat should arrive with less than 1/3 tank
| + | |
| − | * Purge water systems and flush/ bleach
| + | |
| − | * Fresh o rings and gaskets on fuel fill, fresh water fill and holding tank
| + | |
| − | * Flush and purge poop tank? Boat arrived mostly pumped out
| + | |
| − | * Replace or repair two bent stanchions
| + | |
| | | | |
| − | = North Work = | + | ===Hull and woodwork:=== |
| − | * We need a new canvas boot for the mast-deck connection. North. | + | *Renew Bottom Paint (Dions) |
| − | * Two little covers for furler line port. North | + | *Renew topsides paint (Dions) |
| − | * 140 work: Luff tape torn, need to buy a pre-feeder, Shorter aft batten along 140 foot | + | *Maintain varnish on deck structures (Dions) |
| − | * Big red spin- tear near clew repaired | + | *Repair cracked/broken varnish on bowsprit (Dions) |
| − | * Mainsail cover inspected and repaired as needed | + | *Inspect dark spots under fittings at top of mast for rot (Dions) |
| | + | **Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe |
| | + | *Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions) |
| | + | *Plane edges of soleboards/floorboards so they don't stick (Dions) |
| | + | *Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion) |
| | | | |
| − | = Other outsource = | + | ===Sails and canvas:=== |
| − | *Code Zero - must work with current hardware. Sleeve - to fit cable. | + | *Repair 95 and 160 at North |
| − | *New #3 jib? | + | *Patch working jib (MIT) |
| − | * Second spinnaker halyard done properly - consistent in diameter | + | *Renew spreader patches on 160 (MIT) |
| − | * Replace dyneema topping lift? | + | *Verify status of 140 and green spinnaker - are these still at North? |
| − | * New cable for spinnakers | + | *Replace foot battens in 160 (North) |
| | + | *Price out top-down furler for spinnaker |
| | + | *New mast boot (Libby) |
| | | | |
| − | = MIT Work = | + | ===Rigging:=== |
| | + | *End for end mainsheet (Libby) |
| | + | *Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT) |
| | + | **Probably: replace topping lift and/or main halyard (MIT - Dan) |
| | + | *Repair/replace jib car pins |
| | + | *Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?) |
| | + | *Thump mat or puddening for Code Zero furler (MIT) |
| | + | *See if we can remove a shackle from the backstay to allow for better tensioning (MIT?) |
| | + | *Re-seat pin holding lower end of bobstay (Dions) |
| | + | *Inspect fitting that holds forestay to bowsprit for rust (Dions) |
| | + | *Add correct fitting to top of jib furler foil, to prevent wear against the stay |
| | | | |
| − | == Random Work == | + | ===Engine:=== |
| | + | *Winterize engine (Dions) |
| | + | *Change oil and filters (Dions) |
| | + | *Change raw water impeller (Dions) |
| | + | *Change zincs (Dions) |
| | | | |
| − | * Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
| + | ===Systems:=== |
| − | * Bungees on head hatch - Gavin
| + | |
| − | * Mounting for compass? New compass?
| + | |
| | | | |
| − | == Sails==
| + | *Fix leak in bilge pump outflow (should be within MIT capabilities) |
| | + | *Renew gasket/insulation around edge of the forward engine comparment/companionway stairs |
| | + | *Replace joker valve proactively (MIT) |
| | | | |
| − | * Working jib - bolt rope on the luff frayed near the head - fix
| + | ===Gear:=== |
| − | * Stitch zipper stops for all sail bags | + | *New inflator for DanBuoy (got a new cartridge summer 2025; not installed) |
| | | | |
| − | ==Rigging== | + | ===Admin:=== |
| − | * Replace jib sheet - same diameter, length + 1' - maybe just fix? | + | *Renew registration for Mashnee and dinghy |
| − | * Replace or end for end the main sheet | + | *Get copies of Safe Boating Certificates for all skippers to keep on boat |
| − | * Cunningham purchase system to easily be soft shackled on when needed - carabiner?
| + | |
| − | * Longer jib furling line to let us lead it aft? Soft shackle fairlead?
| + | |
| | | | |
| − | * Jib prefeeder - us
| + | ===Shopping List=== |
| − | * Tack line hardware for attaching spin roller furler to a jamming bight - delay for now?
| + | *Air Horns |
| − | * Ring-dings for turnbuckles
| + | |
| − | * Replace all cotter pins
| + | |
| − | * Double smaller block for jib halyard. - Us | + | |
| | | | |
| − | == Shopping List == | + | ==Completed Tasks== |
| − | Stew says we can find most of these in the pavilion
| + | |
| | | | |
| − | * Blue grippy gloves or similar for the boat to have for people to use
| |
| − | * Sail ties that are extra-long -- webbing -- Fran
| |
| − | * Hand sanitizer for onboard use
| |
| − | * 8 wood hangers for the foulies
| |
| − | * 4 more mugs for onboard use: Not sure what is best, we currently have 3 plastic/stainless double wall mugs but they are breaking and we could use a lid. I spent a while looking and feel like maybe this would be good? (Zach). whatever is cheaper: https://pro.westmarine.com/yeti-10-oz.-rambler-mug-with-magslider-lid-P020351821.html or https://rticoutdoors.com/Coffee-Mug
| |
| − | * A metric socket set for onboard tasks (e.g. engine work)
| |
| − | * Chamois for proper clean-up
| |
| − | * 2 pairs of safety glasses for the tool kit
| |
| − | * 4 D batteries for flashlights
| |
| − | * 3 AA batteries for lantern/emergency light
| |
| − | * lantern battery for big flashlight
| |
| − | * Procure origo dometic 3000 rubber gasket for top of fuel container - https://www.atlanticmarinesupply.com/product/dometic-environmental-3880036-00-rubber-gasket/
| |
| − | * Purchase new self-sealing washer for fuel stop solenoid and replace: Volvo Part 21424327. https://www.wholesalemarine.com/volvo-penta-21424327-sealing-ring/
| |
| | | | |
| − | ==Miscellaneous== | + | ==Task Lists from Past Seasons== |
| − | * Handle to replace capstan? Get Fran a drawing - Gavin
| + | |
| − | * Figure out anti-fouling for the dinghy motor (doesn't tilt far enough up to keep prop out of water).
| + | |
| − | * Anti-foul the dinghy bottom
| + | |
| − | * Replace eye for lee cloth on port berth
| + | |
| − | * Repair screen on the starboard porthole
| + | |
| − | * More permanent repair to companionway screen (+ better place to store)
| + | |
| − | * Replace flag on end of windex triangle
| + | |
| − | * Winch handle release issue -- can we fix this?
| + | |
| − | * Clean up wood around bilge panels for easier access
| + | |
| − | * Grease companionway tracks
| + | |
| − | * Spruce up soundproofing around the engine
| + | |
| − | * Enlarge spreader patches after repair on 160
| + | |
| | | | |
| − | ==Radar and electronics==
| + | 2024-2025: [[Task_List_2024-25|here]] |
| − | * Base for radar mount?
| + | |
| − | * Get a new MMSI and reprogram everything so we don't conflict with "FUSION" on the west coast? -- AIS MOB, VHF, etc.
| + | |
| | | | |
| − | == Electrical ==
| + | 2023-2024: [[Task_List_2023-24|here]] |
| − | * High water bilge alarm should be rewired to also pump; right now if the lower switch fails the high water alarm will go off but the pump won’t run - Ted
| + | |
| − | * Cabin lighting -- LED and red/white option (Dions)
| + | |
| − | * Electrical panel -- replace LED "power on indicator" for running lights
| + | |
| | | | |
| − | ==Safety==
| + | 2022-2023: [[Task_List_2022-23|here]] |
| − | | + | |
| − | * Some safety provisions for short-handed and/or night time sailing?
| + | |
| − | * SOP + pictures of jackline setup
| + | |
| − | | + | |
| − | ==Mechanical==
| + | |
| − | * Create a video of changing and seating washers and gaskets properly?
| + | |
| − | | + | |
| − | == Spring (Pre-Launch) Tasks ==
| + | |
| − | * Rearm PFDs & Re-attach MOB AIS units to marker PFDs - Done
| + | |
| − | * Inventory + restock med kit - Done
| + | |
| − | * Go over whole hull for mold/mildew
| + | |
| − | * Sails to move on in spring
| + | |
| − | ** 140
| + | |
| − | ** 160
| + | |
| − | ** New 105
| + | |
| − | ** Main
| + | |
| − | ** New code 0
| + | |
| − | ** Big red
| + | |
| − | | + | |
| − | == Completed Tasks ==
| + | |
| − | * Re-rig reefing hook to sit closer to the boom - Part is in the liquor locker drawers with a shackle on it.
| + | |
| − | * Wipe down all surfaces to reduce mold/mildew. (Used a mild bleach solution followed by freshwater wipe-down)
| + | |
| − | * Scrub overhead above refrigerator to remove mildew
| + | |
| − | * Remove PFDs, lines, [and all other moveable gear not needed by Dions to Bay 4 of the sailing pavilion]
| + | |
| − | * Remove all cutlery, plates, pots, etc.
| + | |
| − | * Inspected mainsail, working jib, 135 and 160 [11 Nov. 2022]
| + | |
| − | * Manually inflate + inspect all PFDs [2 Dec. 2022]
| + | |
| − | * Housing for the radar reflector (bag)
| + | |
| − | * All the dinghy glue [8 April 2023]
| + | |
| − | * Review all tools and service/replace any that are necessary and broken/too rusty [8 April 2023 - Zach]
| + | |
| − | * Whipped old jib sheet ends
| + | |
| − | | + | |
| − | == Completed Procurement ==
| + | |
| − | * Purchase 5 new tethers: https://pro.westmarine.com/west-marine-orc-specification-double-safety-tether-11878691.html
| + | |
| − | * Purchase a new flag for the flagpole: dimensions are: 52” x28.5”
| + | |
| − | * Purchase one new throwable light for 3rd throwable: https://pro.westmarine.com/acr-electronics-hemilight3-hl3-18029827.html
| + | |
| − | * Pylon lights for PFDs (2): https://www.landfallnavigation.com/spinlock-pylon-lifejacket-light.html?
| + | |
| − | * Marpol placards: https://pro.westmarine.com/west-marine-required-waste-oil-garbage-placards-8788986.html
| + | |
| − | * Purchase Extra racor filters - R12P in 10 micron (2) and 30 micron (2) - check current inventory
| + | |
| − | * Procure a few extra emergency bungs: https://pro.westmarine.com/seafit-wooden-emergency-bungs-plugs-4641080.html
| + | |
| − | * Procure a pool noodle (or something else) for storing the battens
| + | |
| − | * LOOS gauge
| + | |
| − | * A third set of foam PFDs so we can have more than 8 people onboard legally : https://pro.westmarine.com/west-marine-type-ii-buoyant-life-jacket-four-pack-adult-over-90lb.-595134.html
| + | |
| − | * Night use distress light: https://pro.westmarine.com/orion-floating-locator-electronic-sos-beacon-kit-18460139.html
| + | |
| − | * CO detector: https://www.westmarine.com/fireboy-xintex-battery-operated-marine-carbon-monoxide-detector-18771691.html
| + | |
| − | * Purchase 3 new rearm kits: https://pro.westmarine.com/spinlock-deckvest-life-jacket-rearming-kit-automatic-33-g.-1-2inch-threaded-9133075.html
| + | |
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.