Please use the discussion page to discuss the prioritization and content of any of these tasks.
 
Please use the discussion page to discuss the prioritization and content of any of these tasks.
  
== Random Work ==
+
==2025 Sailing Season Projects==
  
* Buntlines for main sail reefing (these are the lines that pass through the grommets in the sail)
 
* Repair hinges on lazarette hatch
 
  
== Sails==
+
==2025-26 Offseason Work ==  
  
*140. Need one batten.
+
Observations are listed on Discussion page
  
*Big Red- Repair tear near clew
+
===Hull and woodwork:===
*Code Zero- longer discussion here re: new cable system or new sail
+
*Renew Bottom Paint (Dions)
*Two little covers for furler line port.
+
*Renew topsides paint (Dions)
*New #3 jib?
+
*Maintain varnish on deck structures (Dions)
+
*Repair cracked/broken varnish on bowsprit (Dions)
==Rigging==
+
*Inspect dark spots under fittings at top of mast for rot (Dions)
* Replace + test port spreader light
+
**Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
* Second spinnaker halyard done properly
+
*Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
* Possible jib sheet replacement
+
*Plane edges of soleboards/floorboards so they don't stick (Dions)
* Cunningham purchase system to easily be soft shackled on when needed
+
*Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)
* Furler line led aft to cockpit- Add tail when needed? Block attachment point? More lines in the cockpit is not good except for shorthanded deliveries. Possible solution is to add an extension.
+
* Winches broken down and greased
+
+
==Miscellaneous==
+
*We need a new canvas boot for the mast-deck connection
+
*We need a new (3rd) cowl vent, one went missing at the start of the season
+
*High water bilge alarm should be rewired to also pump; right now if the lower switch fails the high water alarm will go off but the pump won’t run
+
*(reposting) All the hatch hinges need to be strengthened and repaired. We had water intrusion and loss of almost all of them this year (I think it was time catching up to them?)
+
*The forward hatch teeth (the part attached to the hull that the latch goes in) needs to be re-attached
+
*The whole inside of the hull needs to be gone over, especially in the cockpit lockers. There was significant mold/mildew buildup
+
*Purchase more sail ties that are extra-long
+
* purchase some of those blue grippy gloves or similar for the boat to have for people to use
+
  
==Centerboard==
+
===Sails and canvas:===
*Plan is to pull the board right away when hauled.
+
*Repair 95 and 160 at North
*Grind off head until it swings easily through wood on top of the lead keel while swelled up. Remove board again and glass up properly and install downhaul line up through the tube to the cabin top as well.
+
*Patch working jib (MIT)
+
*Renew spreader patches on 160 (MIT)
==Radar and electronics==
+
*Verify status of 140 and green spinnaker - are these still at North?
* More permanent/waterproof template for radar base -- maybe the bipod solution?
+
*Replace foot battens in 160 (North)
* Get rid of gremlins in the wireless displays (voltage boost?)
+
*Price out top-down furler for spinnaker
* Get touchscreen physical buttons properly working
+
*New mast boot (Libby)
* New Raymarine radar so that we can it to display on the chart plotter?
+
  
==Safety==
+
===Rigging:===
 +
*End for end mainsheet (Libby)
 +
*Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
 +
**Probably: replace topping lift and/or main halyard (MIT - Dan)
 +
*Repair/replace jib car pins
 +
*Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
 +
*Thump mat or puddening for Code Zero furler (MIT)
 +
*See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
 +
*Re-seat pin holding lower end of bobstay (Dions)
 +
*Inspect fitting that holds forestay to bowsprit for rust (Dions)
 +
*Add correct fitting to top of jib furler foil, to prevent wear against the stay
  
*Some safety provisions for short-handed and/or night time sailing?
+
===Engine:===
* SOP + pictures of jackline setup
+
*Winterize engine (Dions)
 +
*Change oil and filters (Dions)
 +
*Change raw water impeller (Dions)
 +
*Change zincs (Dions)
  
*Encourage all to take a Safety at Sea seminar this winter.
+
===Systems:===
  
==Mechanical==
+
*Fix leak in bilge pump outflow (should be within MIT capabilities)
*Polish fuel, once in Spring, once again in mid-summer. Extra racor filters and a video of changing and seating washers and gaskets properly?
+
*Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
*Purge and bleach out water systems yes
+
*Replace joker valve proactively (MIT)
*Replace low-pressure engine oil line near on-engine fuel filter that has a nick and slow oil leak. It is getting worse. (+ reattach to prevent chafe; check other lines for potential chafe).
+
*Deck fill o-rings need replacing, especially for the diesel tank
+
+
==Next summer==
+
*Training sessions
+
* Skipper dry run for jacklines + MOB
+
  
== Completed Tasks ==
+
===Gear:===
* Repaired forward hatch hinges
+
*New inflator for DanBuoy (got a new cartridge summer 2025; not installed)
 +
 
 +
===Admin:===
 +
*Renew registration for Mashnee and dinghy
 +
*Get copies of Safe Boating Certificates for all skippers to keep on boat
 +
 
 +
===Shopping List===
 +
*Air Horns
 +
 
 +
==Completed Tasks==
 +
 
 +
 
 +
==Task Lists from Past Seasons==
 +
 
 +
2024-2025: [[Task_List_2024-25|here]]
 +
 
 +
2023-2024: [[Task_List_2023-24|here]]
 +
 
 +
2022-2023: [[Task_List_2022-23|here]]

Latest revision as of 09:13, 3 December 2025

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page to discuss the prioritization and content of any of these tasks.

2025 Sailing Season Projects

2025-26 Offseason Work

Observations are listed on Discussion page

Hull and woodwork:

  • Renew Bottom Paint (Dions)
  • Renew topsides paint (Dions)
  • Maintain varnish on deck structures (Dions)
  • Repair cracked/broken varnish on bowsprit (Dions)
  • Inspect dark spots under fittings at top of mast for rot (Dions)
    • Specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe
  • Re-bed spacer block under forestay tang: bedding is cracking around the edges (Dions)
  • Plane edges of soleboards/floorboards so they don't stick (Dions)
  • Repair/replace block on the forward hatch for the strut and reattach strut (Dion's or MIT: we can bring the hatch to the pavilion)

Sails and canvas:

  • Repair 95 and 160 at North
  • Patch working jib (MIT)
  • Renew spreader patches on 160 (MIT)
  • Verify status of 140 and green spinnaker - are these still at North?
  • Replace foot battens in 160 (North)
  • Price out top-down furler for spinnaker
  • New mast boot (Libby)

Rigging:

  • End for end mainsheet (Libby)
  • Decide on replacement timeline for main halyard, topping lift, red fleck spin halyard, and spin sheets (MIT)
    • Probably: replace topping lift and/or main halyard (MIT - Dan)
  • Repair/replace jib car pins
  • Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
  • Thump mat or puddening for Code Zero furler (MIT)
  • See if we can remove a shackle from the backstay to allow for better tensioning (MIT?)
  • Re-seat pin holding lower end of bobstay (Dions)
  • Inspect fitting that holds forestay to bowsprit for rust (Dions)
  • Add correct fitting to top of jib furler foil, to prevent wear against the stay

Engine:

  • Winterize engine (Dions)
  • Change oil and filters (Dions)
  • Change raw water impeller (Dions)
  • Change zincs (Dions)

Systems:

  • Fix leak in bilge pump outflow (should be within MIT capabilities)
  • Renew gasket/insulation around edge of the forward engine comparment/companionway stairs
  • Replace joker valve proactively (MIT)

Gear:

  • New inflator for DanBuoy (got a new cartridge summer 2025; not installed)

Admin:

  • Renew registration for Mashnee and dinghy
  • Get copies of Safe Boating Certificates for all skippers to keep on boat

Shopping List

  • Air Horns

Completed Tasks

Task Lists from Past Seasons

2024-2025: here

2023-2024: here

2022-2023: here