Difference between revisions of "Mashnee task list"
From MITNA
(→Rigging:) |
(→2025-26 Offseason Work) |
||
| Line 13: | Line 13: | ||
*Renew Bottom Paint | *Renew Bottom Paint | ||
*Renew topsides paint (could be put off a year if necessary) | *Renew topsides paint (could be put off a year if necessary) | ||
| − | *Renew varnish | + | *Renew varnish on deck structures |
*Repair cracked/broken varnish on bowsprit | *Repair cracked/broken varnish on bowsprit | ||
| − | *Inspect dark spots under fittings at top of mast for | + | *Inspect dark spots under fittings at top of mast for rot (specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe) |
*Plane edges of soleboards/floorboards so they don't stick | *Plane edges of soleboards/floorboards so they don't stick | ||
*Repair/replace block on the forward hatch for the strut and reattach strut | *Repair/replace block on the forward hatch for the strut and reattach strut | ||
Revision as of 19:41, 16 November 2025
If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.
Please use the discussion page to discuss the prioritization and content of any of these tasks.
Contents
2025 Sailing Season Projects
2025-26 Offseason Work
Observations are listed on Discussion page
Hull and woodwork:
- Renew Bottom Paint
- Renew topsides paint (could be put off a year if necessary)
- Renew varnish on deck structures
- Repair cracked/broken varnish on bowsprit
- Inspect dark spots under fittings at top of mast for rot (specifically: the spacer block under the forestay tang and the screws holding bronze strips to prevent halyard chafe)
- Plane edges of soleboards/floorboards so they don't stick
- Repair/replace block on the forward hatch for the strut and reattach strut
Sails and canvas:
- Repair 95 and 160 at North
- Patch working jib (MIT)
- Renew spreader patches on 160 (MIT)
- Verify status of 140 and green spinnaker
Rigging:
- End for end mainsheet (Libby)
- Replace main halyard; decide on replacement timeline for topping lift, red fleck spin halyard, and spin sheets
- Repair/replace jib car pins
- Wash salt from standing rigging and inspect for rust damage (At Dion's--will Dion's do this?)
- Thump mat or puddening for Code Zero curler
Engine:
- Winterize engine (Dions)
- Change oil and filters (Dions)
- Change raw water impeller (Dions)
- Change zincs (Dions)
Systems:
- Fix leak in bilge pump outflow
Gear:
- New inflator for DanBuoy (requested for fall 2025--follow up)
Admin:
- Renew registration for Mashnee and dinghy
- Get copies of Safe Boating Certificates for all skippers to keep on boat
Shopping List
- Air Horns
Completed Tasks
Task Lists from Past Seasons
2024-2025: here
2023-2024: here
2022-2023: here