X-Dimension task list

From MITNA
Revision as of 22:55, 17 May 2012 by Mwall (Talk | contribs)

Jump to: navigation, search

If a task is yours and you have additional information about it, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Winter 2011/2012 Tasks

  • septic system - sbussolari
    • install new floorboard
    • plumb refurbished toilet
  • engine - mwall
    • replace two port-side oil hoses
    • refurbish starter motor and solenoid
    • replace exhaust thru-hull
    • replace engine exhaust
    • re-plumb engine shutoff
    • fabricate oil catch pan (template created 03may12)
    • replace alternator belt (40" 25-9425)
    • replace seawater impeller
    • replace/clean primary fuel filter
    • replace/clean fuel/water separator
    • change oil
    • flush and replace coolant
    • change transmission fluid
  • deck
    • re-bed chainplates - 2 port and 2 starboard - mwall
    • seal deck holes - 30-some screw holes for interior grab rails
    • seal deck holes - 4 from old jam cleats
    • seal deck holes - 6 from old aluminum track along starboard side of companionway
    • seal cockpit holes - 2 in port lazarette drain gulley
    • seal cockpit holes - 10 on forward bulkhead
    • seal cockpit holes - autopilot frame
    • glass over former cooler access on port lazarette - tyoung
    • remove remaining 1 wedge from old jam cleats
  • electrical - tyoung
    • refurbish breaker panel
    • install bilge switches (2, illuminated when pump on)
    • install propane solenoid indicator
    • install freshwater pump indicator
    • install indicators for propane, freshwater, bilge at helm
    • replace engine indicator panel plexiglass
    • glass over hole above garmin chartplotter
    • remount and seal garmin instruments
    • tidy up electrical wiring in nav area
  • replace traveler hardware
    • new traveler car
    • new end blocks
  • second coat of bottom paint
  • buff topsides
  • repair scratches in red paint - port aft, stbd midships, port midships, port toerail
  • change hailing port on transom to Cambridge, MA
  • replace head thru-hull - simon

Critical Tasks

  • create freshwater schematic - simon
  • create bilge schematic - keith
  • create 12v schematic - tyoung (See File:X-dimension breakers.pdf)
  • create 110v schematic - tyoung

High Priority Tasks

  • strip peeling paint in cabin interior
  • bleach interior surfaces to kill mildew

Low Priority Tasks

  • paint cabin interior ceiling

Unprioritized Tasks

  • fabricate and install new gaskets on lazarettes
  • install new gasket on galley window
  • re-thread and refurbish soap dispenser at galley - mwall
  • install pen holder at nav station
  • plug holes in nav table
  • replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
  • install lights in port and starboard lazarette
  • fabricate aleida-style lazarette closures
  • repair dodger snaps
  • repair and refinish wooden boarding ladder
  • return main sheet block to original position to eliminate coaming wear
  • lubricate frozen blocks
  • rebuild winches
  • replace boom vang tackle
  • replace cracked boom vang tube
  • bring cleaning supplies to waterboat marina dock box
    • sponges
    • simple green
    • scrubbing brushes
    • broom and dustpan
    • 2 buckets
  • install forward hatch retainer for keeping hatch open
  • re-seat and de-humidify port and starboard compasses
  • repair engine compartment panels and hinges
  • replace electrical switch panels
  • replace nav station light with led
  • strip brightwork and apply cetol
  • re-mount pulpit, back with g10?
  • replace glass in hatches - head and main cabin
  • polish stainless steel pulpit and pushpit
  • fabricate covers for electrical outlets in port lazarette
  • create hangars for fenders in port lazarette
  • refurbish large manual bilge pump

Completed Tasks

  • 17may12 clean waterline - dhealey, uferner
  • 17may12 polish prop - retro
  • 13may12 repair broken floor support in galley - danderson
  • 17may12 install terminator for mast wind instruments - tyoung
  • 17may12 install horn on mast - tyoung
  • 17may12 paint mast - mar, mangle, tyoung
  • 11may12 repair mast corrosion - mwall, kwinstein, tyoung, sbussolari
  • 17may12 sand/grind cracks in bottom - sdynes
  • 17may12 apply filler to bottom cracks - sdynes, tyoung, retro
  • 17may12 paint the bottom - dhealey, uferner, sdynes, mar, retro
  • 17may12 install new engine mount - mangle
  • 14may12 clear obstructions from drainage tubes under primary winches - tyoung
  • 14may12 remove unused wedges from worn jam cleats - mwall
  • 14may12 remove starter motor - tyoung, mwall
  • 14may12 sand hull to prep for paint - retro, dweisman
  • 14may12 clean waterline - uferner, dweisman
  • 14may12 sand/grind/feather keel - sdynes
  • 14may12 sand epoxy on mast - ebrown
  • 14may12 plug 4 holes in rudder - retro
  • 14may12 replace zincs on propellor shaft - dweisman
  • 14may12 remove 5200 scraps from thru-hulls - tyoung, mwall
  •  ??mar12 replace septic system hoses - sbussolari
  •  ??may12 install holding tank - sbussolari
  •  ??may12 rebuild toilet - sbussolari
  •  ??may12 fabricate head floorboard - sbussolari, thall
  • 10may12 figure out better path for traveler lines and cleats - decision made to use 4:1 traveler with cam cleats on ends
  •  ??mar12 replace fractured compass glass on pedestal
  •  ??apr12 fix nav station clock - tyoung
  •  ??may12 install saltwater washdown pump in galley - simon
  •  ??may12 freshwater: install new hoses - simon
  •  ??may12 freshwater: install new faucets in head/cabin - simon
  •  ??may12 freshwater: install saltwater pre-wash to galley sink - simon
  •  ??may12 freshwater: install new drain hoses - simon
  •  ??may12 freshwater: refurbish and install pump, accumulator, filter - simon
  • 10may12 re-core part of foredeck - wfoster
  •  ??apr12 diagnose and repair cracks on deck around jib halyard block
  •  ??apr12 inspect chainplates and mast rigging
  •  ??apr12 re-plumb and rebuild/replace manual bilge pumps (one manual pump installed)
  •  ??apr12 rewire and re-plumb primary (diaphram) bilge pump
  •  ??apr12 install secondary (submersible) bilge pump
  • 26apr12 drill hole for saltwater hand pump
  •  ??mar12 install new thru-hull valves
  • 18feb12 remove toilet floorboard for repair - sbussolari
  • 18feb12 remove batteries from boat - ebrown, tyoung
  • 18feb12 clean bilge well - ebrown
  • 18feb12 clean bildge - ebrown, mwall
  • 18feb12 clean engine - mwall
  • 18feb12 remove hot water heater - tyoung
  • 18feb12 remove propane fittings - tyoung
  • 18feb12 clean cockpit hull interior - kwinstein, tyoung
  • 18feb12 refine septic system layout - sbussolari
  • 18feb12 refine bilge system layout - kwinstein
  • 18feb12 tighten tent - ebrown
  • 15feb12 clean bilge - mwall, ebrown, swatts
  • 15feb12 remove old bilge hoses - kwinstein
  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted