Difference between revisions of "X-Dimension task list"

From MITNA
Jump to: navigation, search
Line 48: Line 48:
 
* repair companionway steps - danderson
 
* repair companionway steps - danderson
 
* repair main cabin floor support port side of mast base - simon
 
* repair main cabin floor support port side of mast base - simon
* fabricate new backing plates for chain plates - mwall
+
* replace broken boom vang tackle and line - keith
* buff topsides
+
* replace cracked boom vang tube - keith
 
* change [[hailing port on transom]] to Cambridge, MA
 
* change [[hailing port on transom]] to Cambridge, MA
 
* strip peeling paint in cabin interior
 
* strip peeling paint in cabin interior
 
* bleach interior surfaces to kill mildew
 
* bleach interior surfaces to kill mildew
 
* procure and install fire extinguishers
 
* procure and install fire extinguishers
* replace broken boom vang tackle and line - keith
 
* replace cracked boom vang tube - keith
 
 
* sort out main sheet routing and blocks
 
* sort out main sheet routing and blocks
 +
* refurbish baby stay fast pins and shackles
  
 
== Low Priority Tasks ==
 
== Low Priority Tasks ==
Line 103: Line 102:
 
== Completed Tasks ==
 
== Completed Tasks ==
  
 +
* 20may12 buff topsides - mwall (3 hours)
 +
* 20may12 install mast hardware - tyoung
 +
* 20may12 repair more wiring - tyoung
 +
* 20may12 apply fastprop to propellor and shaft - ebrown
 +
* 20may12 fabricate g10 backing plates for chain plates - mwall
 +
* 20may12 seal rotted core at chain plates - mwall
 +
* 20may12 paint starboard keel surface first coat - mwall
 +
* 20may12 paint head thru-hull first coat - mwall
 
* 19may12 check and rewire 12V system - tyoung
 
* 19may12 check and rewire 12V system - tyoung
 
* 19may12 second coat of paint on mast spots - eric
 
* 19may12 second coat of paint on mast spots - eric

Revision as of 01:33, 21 May 2012

If a task needs additional explanation, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Winter 2011/2012 Tasks

  • engine - mwall
    • replace two port-side oil hoses?
    • replace engine exhaust
    • re-plumb engine shutoff
    • fabricate oil catch pan (template created 03may12)
    • replace alternator belt (40" 25-9425)
    • replace seawater impeller
    • replace/clean primary fuel filter
    • replace/clean fuel/water separator
    • change oil
    • flush and replace coolant
    • change transmission fluid
  • deck
    • re-bed chainplates - 2 port and 2 starboard - mwall
    • seal deck holes - 30-some screw holes for interior grab rails
    • seal deck holes - 6 from old jam cleats
    • seal deck holes - 6 from old aluminum track along starboard side of companionway
    • seal deck holes - re-bed old baby-stay hard point
    • seal cockpit holes - 2 in port lazarette drain gulley
    • seal cockpit holes - 10 on forward bulkhead
    • seal cockpit holes - autopilot frame
    • seal cockpit holes - blower exhaust
    • seal cockpit holes - 2 compasses
    • glass over former cooler access on port lazarette - tyoung
  • electrical - tyoung
    • refurbish breaker panel
    • install bilge switches (2, illuminated when pump on)
    • install propane solenoid indicator
    • install freshwater pump indicator
    • install indicators for propane, freshwater, bilge at helm
    • replace engine indicator panel plexiglass
    • glass over hole above garmin chartplotter
    • remount and seal garmin instruments
    • tidy up electrical wiring in nav area
  • replace traveler hardware
    • new traveler car
    • install new end controls - simon

High Priority Tasks

  • repair companionway steps - danderson
  • repair main cabin floor support port side of mast base - simon
  • replace broken boom vang tackle and line - keith
  • replace cracked boom vang tube - keith
  • change hailing port on transom to Cambridge, MA
  • strip peeling paint in cabin interior
  • bleach interior surfaces to kill mildew
  • procure and install fire extinguishers
  • sort out main sheet routing and blocks
  • refurbish baby stay fast pins and shackles

Low Priority Tasks

  • paint cabin interior ceiling
  • repair scratches in red paint - port aft, stbd midships, port midships, port toerail

Unprioritized Tasks

  • fabricate and install new gaskets on lazarettes - new gasket material is on boat 17may12
  • install new gasket on galley window
  • re-thread and refurbish soap dispenser at galley - mwall
  • install pen holder at nav station
  • plug holes in nav table
  • replace light fixtures with led fixtures - tyoung
  • install lights in port and starboard lazarette
  • fabricate aleida-style lazarette closures
  • repair dodger snaps
  • repair and refinish wooden boarding ladder - ladder is at pavilion 19may12
  • lubricate frozen blocks
  • rebuild winches
  • install forward hatch retainer for keeping hatch open
  • re-seat and de-humidify port and starboard compasses
  • repair engine compartment panels and hinges
  • replace electrical switch panels
  • replace nav station light with led
  • strip brightwork and apply cetol
  • re-mount pulpit, back with g10?
  • replace glass in hatches - head and main cabin
  • polish stainless steel pulpit and pushpit
  • fabricate covers for electrical outlets in port lazarette
  • create hangars for fenders in port lazarette
  • refurbish large manual bilge pump
  • create freshwater schematic - simon
  • create bilge schematic - keith
  • create 12v schematic - tyoung (See File:X-dimension breakers.pdf)
  • create 110v schematic - tyoung
  • create septic system schematic
  • bring cleaning supplies to waterboat marina dock box
    • sponges
    • simple green
    • scrubbing brushes
    • broom and dustpan
    • 2 buckets

Completed Tasks

  • 20may12 buff topsides - mwall (3 hours)
  • 20may12 install mast hardware - tyoung
  • 20may12 repair more wiring - tyoung
  • 20may12 apply fastprop to propellor and shaft - ebrown
  • 20may12 fabricate g10 backing plates for chain plates - mwall
  • 20may12 seal rotted core at chain plates - mwall
  • 20may12 paint starboard keel surface first coat - mwall
  • 20may12 paint head thru-hull first coat - mwall
  • 19may12 check and rewire 12V system - tyoung
  • 19may12 second coat of paint on mast spots - eric
  • 19may12 remove blower vent, worn jam cleat - larry
  • 19may12 second coat of bottom paint touchup - ulric
  • 19may12 apply more filler on keel - ulric
  • 19may12 install head thru-hull - simon
  • 19may12 remove corroded backing plates for chain plates - mwall
  • 19may12 replace exhaust thru-hull - mwall
  • 19may12 paint transducer - mwall
  • 18may12 remove compasses for refurbishment - tyoung
  • 18may12 install new floorboard - sbussolari
  • 18may12 plumb refurbished toilet - sbussolari
  • 18may12 install new breakers, wiring - tyoung
  • 18may12 grind epoxy from chainplates - mwall
  • 18may12 install new starter motor - tyoung, mwall
  • 18may12 bottom paint touchup - mwall
  • 17may12 clean waterline - dhealey, uferner
  • 17may12 polish prop - retro
  • 13may12 repair broken floor support in galley - danderson
  • 17may12 install terminator for mast wind instruments - tyoung
  • 17may12 install horn on mast - tyoung
  • 17may12 paint mast - mar, mangle, tyoung
  • 11may12 repair mast corrosion - mwall, kwinstein, tyoung, sbussolari
  • 17may12 sand/grind cracks in bottom - sdynes
  • 17may12 apply filler to bottom cracks - sdynes, tyoung, retro
  • 17may12 paint the bottom - dhealey, uferner, sdynes, mar, retro
  • 17may12 install new engine mount - mangle
  • 14may12 clear obstructions from drainage tubes under primary winches - tyoung
  • 14may12 remove unused wedges from worn jam cleats - mwall
  • 14may12 remove starter motor - tyoung, mwall
  • 14may12 sand hull to prep for paint - retro, dweisman
  • 14may12 clean waterline - uferner, dweisman
  • 14may12 sand/grind/feather keel - sdynes
  • 14may12 sand epoxy on mast - ebrown
  • 14may12 plug 4 holes in rudder - retro
  • 14may12 replace zincs on propellor shaft - dweisman
  • 14may12 remove 5200 scraps from thru-hulls - tyoung, mwall
  •  ??mar12 replace septic system hoses - sbussolari
  •  ??may12 install holding tank - sbussolari
  •  ??may12 rebuild toilet - sbussolari
  •  ??may12 fabricate head floorboard - sbussolari, thall
  • 10may12 figure out better path for traveler lines and cleats - decision made to use 4:1 traveler with cam cleats on ends
  •  ??mar12 replace fractured compass glass on pedestal
  •  ??apr12 fix nav station clock - tyoung
  •  ??may12 install saltwater washdown pump in galley - simon
  •  ??may12 freshwater: install new hoses - simon
  •  ??may12 freshwater: install new faucets in head/cabin - simon
  •  ??may12 freshwater: install saltwater pre-wash to galley sink - simon
  •  ??may12 freshwater: install new drain hoses - simon
  •  ??may12 freshwater: refurbish and install pump, accumulator, filter - simon
  • 10may12 re-core part of foredeck - wfoster
  •  ??apr12 diagnose and repair cracks on deck around jib halyard block
  •  ??apr12 inspect chainplates and mast rigging
  •  ??apr12 re-plumb and rebuild/replace manual bilge pumps (one manual pump installed)
  •  ??apr12 rewire and re-plumb primary (diaphram) bilge pump
  •  ??apr12 install secondary (submersible) bilge pump
  • 26apr12 drill hole for saltwater hand pump
  •  ??mar12 install new thru-hull valves
  • 18feb12 remove toilet floorboard for repair - sbussolari
  • 18feb12 remove batteries from boat - ebrown, tyoung
  • 18feb12 clean bilge well - ebrown
  • 18feb12 clean bildge - ebrown, mwall
  • 18feb12 clean engine - mwall
  • 18feb12 remove hot water heater - tyoung
  • 18feb12 remove propane fittings - tyoung
  • 18feb12 clean cockpit hull interior - kwinstein, tyoung
  • 18feb12 refine septic system layout - sbussolari
  • 18feb12 refine bilge system layout - kwinstein
  • 18feb12 tighten tent - ebrown
  • 15feb12 clean bilge - mwall, ebrown, swatts
  • 15feb12 remove old bilge hoses - kwinstein
  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted