== Winter 2011/2012 Tasks ==
 
== Winter 2011/2012 Tasks ==
 
* bilge - keith
 
* bilge - keith
** remove old bilge hoses
 
 
** rewire and re-plumb primary (diaphram) bilge pump
 
** rewire and re-plumb primary (diaphram) bilge pump
 
** install secondary (submersible) bilge pump
 
** install secondary (submersible) bilge pump
Line 17: Line 16:
 
** replace engine exhaust
 
** replace engine exhaust
 
** re-plumb engine cutoff
 
** re-plumb engine cutoff
** ensure oil catch
+
** fabricate oil catch pan
 +
** replace alternator belt
 +
** re-attach exhaust thru-hull
 +
** check impeller condition
 +
** top up lubricants and coolants
 
* freshwater - simon
 
* freshwater - simon
 
** install new hoses
 
** install new hoses
Line 30: Line 33:
 
** seal deck holes
 
** seal deck holes
 
** re-core part of foredeck
 
** re-core part of foredeck
 +
** install new thru-hull valves
 
* instruments - tyoung
 
* instruments - tyoung
 
** refurbish breaker panel
 
** refurbish breaker panel
Line 58: Line 62:
 
== High Priority Tasks ==
 
== High Priority Tasks ==
  
* fabricate permanent oil catch-pan
 
 
* strip peeling paint in cabin interior
 
* strip peeling paint in cabin interior
  
Line 68: Line 71:
  
 
* replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
 
* replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
 +
* install lights in port and starboard lazarette
 
* repair dodger snaps
 
* repair dodger snaps
* clean bilge completely of oil
 
 
* repair and refinish wooden boarding ladder
 
* repair and refinish wooden boarding ladder
 
* return main sheet block to original position to eliminate coaming wear
 
* return main sheet block to original position to eliminate coaming wear
Line 101: Line 104:
 
== Completed Tasks ==
 
== Completed Tasks ==
  
 +
* 18feb12 remove toilet floorboard for repair - sbussolari
 +
* 18feb12 remove batteries from boat - ebrown, tyoung
 +
* 18feb12 clean bilge well - ebrown
 +
* 18feb12 clean bildge - ebrown, mwall
 +
* 18feb12 clean engine - mwall
 +
* 18feb12 remove hot water heater - tyoung
 +
* 18feb12 remove propane fittings - tyoung
 +
* 18feb12 clean cockpit hull interior - kwinstein, tyoung
 +
* 18feb12 refine septic system layout - sbussolari
 +
* 18feb12 refine bilge system layout - kwinstein
 +
* 18feb12 tighten tent - ebrown
 +
* 15feb12 clean bilge - mwall, ebrown, swatts
 +
* 15feb12 remove old bilge hoses - kwinstein
 
* 04feb12 remove headliner and trim - simon, mwall
 
* 04feb12 remove headliner and trim - simon, mwall
 
* 04feb12 remove unused wiring - tyoung
 
* 04feb12 remove unused wiring - tyoung

Revision as of 18:10, 19 February 2012

If a task is yours and you have additional information about it, please make a page for that task and post updates. When a task is completed, move it to the 'Completed Tasks' section, and include the date it was completed.

Please use the discussion page if you disagree with the prioritization of any of these tasks.


Winter 2011/2012 Tasks

  • bilge - keith
    • rewire and re-plumb primary (diaphram) bilge pump
    • install secondary (submersible) bilge pump
    • re-plumb and rebuild/replace manual bilge pumps
  • septic system - sbussolari
    • replace septic system hoses
    • install holding tank
    • rebuild toilet
  • engine - mwall
    • replace engine exhaust
    • re-plumb engine cutoff
    • fabricate oil catch pan
    • replace alternator belt
    • re-attach exhaust thru-hull
    • check impeller condition
    • top up lubricants and coolants
  • freshwater - simon
    • install new hoses
    • install new faucets in head/cabin
    • install saltwater pre-wash to galley sink
    • install new drain hoses
    • refurbish and install pump, accumulator, filter
  • rigging - wfoster
    • diagnose and repair cracks on deck around jib halyard block
    • repair mast corrosion
    • inspect chainplates and mast rigging
    • seal deck holes
    • re-core part of foredeck
    • install new thru-hull valves
  • instruments - tyoung
    • refurbish breaker panel
    • install bilge switches (2, illuminated when pump on)
    • install propane solenoid indicator
    • install freshwater pump indicator
    • install indicators for propane, freshwater, bilge at helm
    • replace engine indicator panel plexiglass
    • patch hole above garmin chartplotter
    • remount and seal garmin instruments
    • tidy up electrical wiring in nav area
  • prepare and paint bottom
  • replace traveler hardware
    • new traveler car
    • new end blocks
    • figure out better path for lines and cleats
  • plug 4 holes in rudder
  • replace zincs
  • repair scratches in red paint - port aft, stbd midships, port midships, port toerail

Critical Tasks

  • create freshwater schematic - simon
  • create bilge schematic - keith
  • create 12v schematic - tyoung
  • create 110v schematic - tyoung

High Priority Tasks

  • strip peeling paint in cabin interior

Low Priority Tasks

  • paint cabin interior ceiling

Unprioritized Tasks

  • replace light fixtures with led fixtures (5 dome lights in main cabin, 5 berth spotlights, 2 fwd berth spotlights, 1 dome light in head, 4 floor-directed lights) - tyoung
  • install lights in port and starboard lazarette
  • repair dodger snaps
  • repair and refinish wooden boarding ladder
  • return main sheet block to original position to eliminate coaming wear
  • lubricate frozen blocks at mast base
  • rebuild winches
  • replace boom vang tackle
  • bring cleaning supplies to boat and dock box
    • sponges
    • simple green
    • scrubbing brushes
    • broom and dustpan
    • paper towels
    • rags
    • 2 buckets
  • install forward hatch retainer for keeping hatch open
  • re-seat and de-humidify port and starboard compasses
  • repair engine compartment panels and hinges
  • fix nav station clock
  • replace electrical switch panels
  • replace nav station light with led
  • strip brightwork and apply cetol
  • new screws in lazarette latch hardware
  • re-mount pulpit, back with g10?
  • replace glass in hatches - head and main cabin
  • replace fractured compass glass on pedestal
  • seal holes in cockpit
  • polish stainless steel pulpit and pushpit
  • fabricate covers for electrical outlets in port lazarette
  • create hangars for fenders in port lazarette

Completed Tasks

  • 18feb12 remove toilet floorboard for repair - sbussolari
  • 18feb12 remove batteries from boat - ebrown, tyoung
  • 18feb12 clean bilge well - ebrown
  • 18feb12 clean bildge - ebrown, mwall
  • 18feb12 clean engine - mwall
  • 18feb12 remove hot water heater - tyoung
  • 18feb12 remove propane fittings - tyoung
  • 18feb12 clean cockpit hull interior - kwinstein, tyoung
  • 18feb12 refine septic system layout - sbussolari
  • 18feb12 refine bilge system layout - kwinstein
  • 18feb12 tighten tent - ebrown
  • 15feb12 clean bilge - mwall, ebrown, swatts
  • 15feb12 remove old bilge hoses - kwinstein
  • 04feb12 remove headliner and trim - simon, mwall
  • 04feb12 remove unused wiring - tyoung
  • 04feb12 remove freshwater hoses and corroded fittings - simon
  • 04feb12 remove riser and exhaust hose - mwall
  • 04feb12 clean deck, collect old parts - keith
  • 15jan12 eliminate rudder leaks - wfoster
  •  ??oct11 shorten dinghy painter to 2 dinghy boat lengths
  •  ??oct11 identify source of bilgewater (bilge filled while sailing 10sep11)
  •  ??oct11 install float switch on primary bilge pump
  • 01oct11 Installed interior dogging handles on aft hatch - sbussolari
  • 24sep11 installed dorade vents - stefie tellex
  • 24sep11 installed snuffer on asymmetric spinnaker - sbussolari
  • 14sep11 install bilge pump float switch and wire to primary bilge pump - mwall and sbussolari
  • 15sep11 create as-is septic schematic - ted
  • 11sep11 install security wire in dinghy - eric
  • 11sep11 install retainer bungies on port and starboard lazarette lids - mwall
  • 11sep11 install winch holders in cockpit - mwall
  • 11sep11 install dodger to reduce water through coaming and companionway
  • 11sep11 install reefing line - thall
  • 11sep11 replace screws on lazarette latches - eric, simon
  • 11sep11 clean bilge - ksovie, bdeffenbaugh
  • 11sep11 install mast boot tape - mwall
  • 10sep11 install temporary oil catchpan
  • 10sep11 inventory of lines on board - kwinstein and stellex
  • 10sep11 septic diagram - kwinstein and stellex
  • 10sep11 re-rig lazy jack lines - mwall
  • 10sep11 tighten lifelines - sbussolari
  • 03sep11 Commission Dinghy and berth at Waterboat Marina - ted