Winterizing

From MITNA
Revision as of 23:47, 13 November 2007 by ThomS (Talk | contribs)

Jump to: navigation, search

Nevermore is on the hard in a parking lot directly next to the MBTA Harbor Express ferry terminal in Quincy: See this map of her location

Tasks That Must Be Done First

  • Move mast from aboard to on ground (Frannie to request boatyard)

Tasks That Must Be Done Soon (Before it Freezes)

  • Winterize engine (ThomS)
    • Change Engine Oil and Filter
    • Change Transmission Fluid
    • Fog Cylinders
    • Drain and flush old antifreeze from cooling system and add fresh antifreeze
    • Drain salt-water from raw cooling system. and/or below
    • Add antifreeze to salt-water system/exhaust pot (bio-friendly)
  • Drain Freshwater tanks
  • Add non-toxic antifreeze to freshwater system.
  • Add non-toxic antifreeze to head/holding tank [discuss ]
  • Add antifreeze/rocksalt to bilge (or get the last few inches of water out) [discuss ]
  • Top up batteries' charges [discuss ]

Other Tasks That Should Be Done Soon

  • Install Winter Cover (needs mast moved to ground first) (crew)

-

  • Tasks to be done at Pavilion:
    • Remove battens and dutchman rig from mainsail & furl neatly (mainsail is at pavilion) (crew)
    • Furl Genoa neatly, find a sailbag (Genoa is at pavilion) (crew)
    • Get mainsail washed and perform any necessary maintenance (Frannie)
    • Get Genoa Washed (Frannie) [discuss ]


Done Tasks

  • Lock up bow anchor - DONE 04Nov - ThomS
  • Acquire a ladder/chain/lock and lock ladder to boat stands - DONE 04Nov - Brian R, ThomS
  • Bring electrical extension cord (c.300-foot) - DONE 04 & 08Nov - ThomS
  • Buy c.150-foot hose - DONE - bought 50+50-feet, Thom loans c.20-feet - 13Nov
  • Make sawhorses to store mast on - DONE 12-13Nov - Dave A, ThomS


Equipment Borrowed from Sailors, to be returned after winterizing

  • Extension ladder (return after spring launch) - ThomS
  • Hose (c.20-feet section) - ThomS

External Links