Difference between revisions of "Nevermore Return Checklist"

From MITNA
Jump to: navigation, search
 
(26 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
This is the checklist of things to do before leaving the boat.
 
This is the checklist of things to do before leaving the boat.
  
* set main breaker to 'off'.
+
* Remove ensign from stern, stow in port shelf of V berth.
* set both battery switches to 'off'.
+
* Remove MITNA burgee, stow in port cabinet of main cabin.
* hang guppy from stern, about 2 feet into the water.  route cable through steering wheel and clip to backstay.
+
* Remove radar reflector, stow at bow end of starboard berth.
* remove ensign from stern, stow in port shelf of v berth.
+
* Remove GPS, stow in top drawer of nav station.
* remove mitna flag, stow in port cabinet of main cabin.
+
* Stow winch handles in middle drawer of nav station.
* close hatches (2) and ports (9)
+
* Stow gaffing hooks in starboard lazarette.
* close head valves (2)
+
* Cover binnacle compass (cover stored in top drawer of nav station).
* tidy up
+
* Ensure that mainsail is tied and covered.
 +
* Ensure that headsail is furled and secured, and jib sheets are tight.
 +
* Ensure that main and spinnaker halyards are tightly secured and not flogging the mast.
 +
* Ensure that centerboard is in 'up' position.
 +
* Ensure that the boom and sailcover will not touch the dodger.
 +
* Close hatches (there are 2) and window ports (there are 9).
 +
* Close head valves (there are 2).
 +
* Tidy up
 
** wipe kitchen surfaces
 
** wipe kitchen surfaces
 
** sweep/wipe cabin floor
 
** sweep/wipe cabin floor
 
** sweep/wipe cockpit surfaces
 
** sweep/wipe cockpit surfaces
 
** wash/scrub topsides with freshwater
 
** wash/scrub topsides with freshwater
* make/complete log entry, including:
+
* Complete log entry, including:
 
** date and time
 
** date and time
** engine hours
+
** engine hours and fuel level
** name of each person on board
+
** name of person making the entry
** enumeration of things that were repaired, need to be repaired.
+
** description of trip, including destination, route, weather
* install companionway boards.
+
** enumeration of things that were repaired, need to be repaired, will soon need to be repaired
* lock cabin, starboard lazarette, stern lazarette.
+
* Stow cockpit cushions on edge in cabin.
 +
* Ensure that stove valve is off and tank is depressurized.
 +
* Ensure that bilge pump switch is in 'automatic' position (down).
 +
* Set all breakers on nav station to 'off'.
 +
* Set both battery switches to 'off' (pointer to 6 o'clock position).
 +
* Install companionway boards.
 +
* Tighten steering brake with rudder in centered position.
 +
* Deploy the guppy, clamp to backstay
 +
* Lock cabin, starboard lazarette, stern lazarette (locks stored in top drawer of nav station).
 +
 
 +
 
 +
{{discuss}}

Latest revision as of 10:47, 15 August 2011

This is the checklist of things to do before leaving the boat.

  • Remove ensign from stern, stow in port shelf of V berth.
  • Remove MITNA burgee, stow in port cabinet of main cabin.
  • Remove radar reflector, stow at bow end of starboard berth.
  • Remove GPS, stow in top drawer of nav station.
  • Stow winch handles in middle drawer of nav station.
  • Stow gaffing hooks in starboard lazarette.
  • Cover binnacle compass (cover stored in top drawer of nav station).
  • Ensure that mainsail is tied and covered.
  • Ensure that headsail is furled and secured, and jib sheets are tight.
  • Ensure that main and spinnaker halyards are tightly secured and not flogging the mast.
  • Ensure that centerboard is in 'up' position.
  • Ensure that the boom and sailcover will not touch the dodger.
  • Close hatches (there are 2) and window ports (there are 9).
  • Close head valves (there are 2).
  • Tidy up
    • wipe kitchen surfaces
    • sweep/wipe cabin floor
    • sweep/wipe cockpit surfaces
    • wash/scrub topsides with freshwater
  • Complete log entry, including:
    • date and time
    • engine hours and fuel level
    • name of person making the entry
    • description of trip, including destination, route, weather
    • enumeration of things that were repaired, need to be repaired, will soon need to be repaired
  • Stow cockpit cushions on edge in cabin.
  • Ensure that stove valve is off and tank is depressurized.
  • Ensure that bilge pump switch is in 'automatic' position (down).
  • Set all breakers on nav station to 'off'.
  • Set both battery switches to 'off' (pointer to 6 o'clock position).
  • Install companionway boards.
  • Tighten steering brake with rudder in centered position.
  • Deploy the guppy, clamp to backstay
  • Lock cabin, starboard lazarette, stern lazarette (locks stored in top drawer of nav station).


[discuss ]