(by person)

From MITNA
Revision as of 11:00, 7 March 2016 by Scott (Talk | contribs)

Jump to: navigation, search

Edit to show progress...

Greg:

  • Repair keel - Greg. Greg has made good progress, Franny will push for him to complete the keel for launch.

Greg should provide guidance wrt bottom, mast/boom and topsides painting.

Lloyd:

  • Fix engine oil leaks - Lloyd. Lloyd says he’s on this; I’ll keep pushing him. No real Plan B if Lloyd doesn’t move on this; I think we need to pull the engine to do the job right.

Eric:

  • Remove corrosion on mast and boom; repaint - Eric We should work on the boom and the mast. No progress on this yet that I know of.
  • Binnacle light - Eric (can be done after splash)
  • Touch up topsides paint - Eric. Ditto wrt Greg. Our topsides Awlgrip color is Cabernet Burgundy as far as I can tell - Greg has a set of color samples. He might have a few touch-up kits; he said he would order a few last spring for this purpose. Buffing the topsides is part of this.

Scott:

  • Engine maintenance (change oil/various filters/replace raw water pump) - Scott.
  • Replace nuts on rear quarter fittings - Scott
  • New blocks for mainsheet - Scott These are in hand.
  • New shackles to fasten traveler adjusting blocks to car - Scott.
  • Inspect running rigging - Scott.
  • Take halyards/pfds/harnesses/jacklines/foulies/blocks/radios&plugs/puck compass/ditch bag/laptop/iPad to boat.

Ted:

  • Replace damaged NMEA terminator for anemometer on masthead - Ted
  • Inspect steering gear, grease rudderpost - Ted
  • Condition batteries - Ted. I have no idea where this is at.
  • Cetol woodwork - Ted. Scott applied a couple of coats of Cetol to the worst parts last Fall; we should put on a couple of coats more.

Adam:

  • Repair dodger - Adam
  • Remove, refurbish and reinstall fuel tank - Adam.

Tim/Adam:

  • Paint bottom - Tim/Adam. This should be done with oversight from Greg - he knows how to do this really well and we do not (yet).

Other:

  • Sails (new asym, re-cut #1 and #3, new #4, main with flattening reef). The sails are being finished up. Brad says the main/#1/#3 are ready to be picked up.
  • Take cushions from pav to boat
  • Take boom to boat
  • Inflate red dinghy, coat with ArmorAll, move to Waterboat.
  • Clean, buff and Propspeed prop
  • replace prop shaft zincs