75th Anniversary
Old notices
Upcoming Events
Sat Dec 5NEISA (2009 Scheduling) (ST)
Latest Results
Nov 7Oct 31Oct 24Oct 11See all resultsNotices
No current announcements.
Old notices
The Provisional Rating [.ps] [.pdf]
The purpose of the Provisional Rating is to assure the Staff that all members can safely and competently take care of themselves, their guests, and the Tech Dinghy while sailing on the Charles River. Every member is expected to take the check-off as soon as they are ready. Anyone taking out a Tech with only a swim rating may be asked to use a small sail or not be allowed to sail based on the wind conditions. Completion of the Provisional allows the member to sail Lasers and Rhodes 19s in light wind conditions.
Sailing and Maneuvering
- Leaving the dock
- Beat, reach, run, jibe and tack
- Getting out of irons
- Proper trim of sail
- Proper trim of boat
- Use of centerboard
- Man overboard procedure
- Landing at dock
Precautions and Safety
- Restricted sailing areas
- Maximum number of people in boats
- Procedure after capsize
- Explain recall signals (Rule 16)
- Number of lifejackets required
Rules of the Road
- Avoid all confrontations when possible
- Three basic sailing rules
- Right of way between powerboats, sailboats and rowboats
Rigging the Tech Dinghy
- Knots: bowline, figure eight, stunsail tack bend, clove hitch
- Step mast, rig boom and sail
- Launch the boat
- Care of boat at dock
- Set sail and make boat ready
- Haul, unrig and stow boat inside
- Haul, unrig and leave boat on dock
- Roll sail
- Furl sail on boom
- Rig a small sail
- Proper method of cleating the halyard

